Loading...
Stoneleigh P2-LR010207 REPORT OF FIELD COMPACTION TESTS ALPHA TESTINg;, INC. 2209 Wisconsin St.. Suite 100 Do#os, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 02/07/01 DALLAS, TEXAS PROJECT STONELEIGH @ RIVERCHASE OUR REPORT NO. 00652-119 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 319 02107/01 SG/FG 2 17.5 108.5 18.0 104 96 2-A 320 02107101 SG/FG 2 17.5 108.5 19.3 103 95 2-A 321 02/07/01 SG/FG 2 17.5 108.5 17.8 106 98 2-A 322 02/07/01 SG/FG 2 17.5 108.5 17.7 106 98 2-A TEST LOCATION: PAVING 319 25' SOUTH AND 35' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 320 40' WEST AND 30' SOUTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 321 35' WEST AND 60' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 322 25' WEST AND 15' NORTH FROM THE NORTHWEST CORNER OF BUILDING PAD #10 CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL - JAN BERTRAND, CITY OF COPPELL ~ I FILL * A. I. PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 L, IME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENTTREATEO D. RETEST' "~ Oeotechni~al Engineering/~ Construction Materials Testing ~ Environmental Engineering / Conl[ulti~ f ALPHA TESTINg, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 - DAILY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 02/07101 DALLAS, TEXAS PROJECT: STONELEIGH @ RIVERCHASE OUR REPORT NO: 00652-120 COPPELL, TEXAS TECHNICIAN: P.J. WEATHER: CLEAR TEMPERATURE RANGE: 52 TO 75 iTHE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REOUESTED TO i MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REOUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 4 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATlyE THE C .YU.I~.~I~6 WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: PAVING "H" AT i754 F'I~OM API!~.'H'CENTER OF FIRE LANE SET ~2: PAVING "H' SOUTH OF GI.~A SET #3: PAVING "H" PLACED AT 8WELL SET #4: PAVING "H" PLACED AT BOLLARDS THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. iAT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. 'CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTI~kND, CITY OF COPPELL Geotechnical Engin~. rfng 0 Construction Materials Testing 0 Environmental Engineerfng 0 Consulting · .¢--... -.,.....~.~,...!~:,.:,,; }:;~!(t~,-;,,-'. :.,~,;.' ... - .,: . .~ .-.:. - ',.,¢~4(:~.,.~.-..:¢~-;,,,..,'.:...-=' ~ , . - '...: ALPHA TESTING, INC. 2209 ~ ~t., ~lte I00 DaI~ Texas DAILY FIELD REPORT F~: 972/~3 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 2/7/01 DALLAS, TEXAS PROJECT: STONELEIGH ¢} RIVERCHASE OUR REPORT NO: 00652-127 COPPELL, TEXAS TECHNICIAN: J.S. WEATHER: SUNNY TEMPERATURE RANGE: 55 TO 75 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 2 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: BUILDING PAD #13, BREEZEWAY SET #2: BUILDING PAD #13, 20' FROM SOUTH END THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL C. Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 V~bcon~n St., Suite 100 Do#os, Texos 75229 972/620-8911 - 972/263-4@37 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 02/07/01 DALLAS. TEXAS PROJECT STONELEIGH @ RIVERCHASE OUR REPORT NO. 00652-119 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH'~,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 319 02/07/01 SG/FG 2 17.5 108.5 18.0 104 96 2-A 320 02/07/01 SG/FG 2 17.5 108.5 19.3 103 95 2-A 321 02/07/01 SG/FG 2 17.5 108.5 17.8 106 98 2-A 322 02/07/01 SG/FG 2 17.5 108.5 17.7 106 98 2-A TEST LOCATION: PAVING 319 25' SOUTH AND 35' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 320 40' WEST AND 30' SOUTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 321 35' WEST AND 60' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 322 25' WEST AND 15' NORTH FROM THE NORTHWEST CORNER OF BUILDING PAD #10 CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL I FILL A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~ 2 NATURAL SUBGRADE B PERC_ENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~/~ ~ 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST- Geotechnical Engineering ~ Construction Materials Testing ~] Environmental Engineering n ~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite I00 Dallas, Texas 75229 972/620-8911- 972/263-4937 (Metro) DAILY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 02/07/01 DALLAS, TEXAS PROJECT: STONELEIGH @ RIVERCHASE OUR REPORT NO: 00652-120 COPPELL, TEXAS TECHNICIAN: P.J. WEATHER: CLEAR TEMPERATURE RANGE: 52 TO 75 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REOUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REOUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 4 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: PAVING "H" AT 175' FROM APPROACH CENTER OF FIRE LANE SET ~2: PAVING "H" SOUTH OF G1-A SET #3: PAVING "H" PLACED AT SWELL SET #4: PAVING "H" PLACED AT BOLLARDS THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. I'CC: I LARRY DAVIS, CITY OF COPPELL ILANNY ALLISON, CITY OF COPPELL i JAN BERTRAND, CITY OF COPPELL Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting ~:. .'~.~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite I00 Do#as, Texos 75229 972/620-8911-972/263-4937 (Metro) DALLY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 2/7/01 DALLAS, TEXAS PROJECT: STONELEIGH ~} RIVERCHASE OUR REPORT NO: 00652-127 COPPELL, TEXAS TECHNICIAN: J.S. WEATHER: SUNNY TEMPERATURE RANGE: 55 TO 75 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 2 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: BUILDING PAD #13, BREEZEWAY SET #2: BUILDING PAD #13, 20' FROM SOUTH END THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL C. Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting