Loading...
Stoneleigh P2-LR010205 ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 [tenort (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-107 ATTN: KELLER WEBSTER Issue Date: 02/05/2001 10950 ALDER CIRCLE DALLAS, TX 75238 ~. Project Deac: STONELEIGH ~} RIVERCHASE COPPELL, TEXAS FIELD DATA Placement Location: SLAB: BUILDING 10 UNIT, NORTH OF MIDDLE Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: NIA Dellvmy Ticket No.: 6141660 Slump (ASTM C.t43): 5 Mede By: CONTRACTOR Air Content: N/A Cured Specification: ASTM C-31 Air Tempemtm~: NIA Specimen T~ml~reture: N/A Date Received: 1/29/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Teeted: (Days): Length Width Diameter Sq. In. Load: FSI: 215 LAB C-617 2/2/01 7 12 NIA 6 28.27 73253 2590 216 LAB 2/23/01 28 12 N/A 6 28.27 0 217 LAB 2/23/01 28 12 N/A 6 28.27 0 218 LAB HOLD HOLD 12 N/A 6 28.27 0 ' I i sp,.:~.~.on.= ~ 3000 IR Nu~ to Date: N/A Notes: CLIENT MADE CYLINDERS Respectfully Sulxnilted By: ]./~' ... of Alpha Testing, Inc. ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 ge, or* (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-108 ATTN: KELLER WEBSTER Issue Date: 02/05/2001 10950 ALDER CIRCLE DALLAS. TX 75238 Fax Number: (214) 340-9100 Project Deec: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS RELD DATA Placement Location: SLAB: BUILDING 10, NORTH END OF BUILDING CENTER Date Placed: 1126/01 Plant Number: 6-3000 Time Pieced: N/A Delivery Ticket No.: 6141677 Slump (ASTM C-143): 4 Made By: CONTRACTOR Air Content: N/A Cured Specification: ASTM C-31 Air Temperature: N/A Specimen T~mperature: N/A Date Received: 1/29/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cum Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Day/): Length Width Diameter Sq. In. Load: 1=81: 219 LAB C-617 2/2/01 7 12 N/A 6 28.27 88288 3120 220 LAB 2/23/01 28 12 N/A 6 28.27 0 221 LAB 2/23/01 28 12 N/A 6 28.27 0 222 LAB HOLD HOLD 12 N/A 6 28,27 0 I Specifications: 26 3000 Notes: CLIENT MADE CYLINDERS ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 (972) 620-8911 Tested For: SPRING VALLEY CONSTR0CTION Our Report No.: 00652-109 ATTN: KELLER WEBSTER Issue Date: 02/05/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Desc: STONELEIGH Q RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: SLAB: BUILDING 10 PATIO B6 UNIT SOUTH END Date Placed: 1/26/01 Plant Number: 6-3000 T~me Raced: N/A Delivery Ticket No.: 6141699 Slump (A~T~ C-t43): 3.5 Made By: CONTRACTOR Air Content: N/A Air Temperature: N/A Cured Specification: ASTM C-31 Specimen Temperature: N/A Date Received: 1/29/01 Delivery Method: PICKED UP BY ALPHA Field Data ~4&milted By: CONTRACTOR Mix Data ~ubmitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Te~ted: (Days): Length Width Diameter Sq. In. Load: PSI: 223 LAB C-617 2/2/01 7 12 N/A 6 28.27 87885 3100 224 LAB 2/23/01 28 12 N/A 6 28.27 0 225 LAB 2/23/01 28 12 N/A 6 28.27 0 226 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3000 I R~ult~ to Date: N/A Nnt~: CUENT MADE CYLINDERS I~___~11~ Submilted By: ti/ of Alpha Tesling, Inc. ALPHA TESTING, INC. Concrete Test 2209 Wisconsin St., Suite 100 om ,ress.on Dallas, Texas 75229 (972) 620-8911 Te~l~l For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-94 ATrN: KELLER WEBSTER Issue Date: 02/05/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Deag: STONELEIGH O RIVERCHASE COPPELL, TEXAS FIELD DA TA Pl~gement Loc~tlon: CURB & GU1TER ON RIVER CHASE NORTH OF JOB ~ PIm~d: 1/5/01 Plant Number: 3-3000 Time Pl~ed: 3:20 PM Delivery Ticket No.: 3118228 Slump (AgTM C-14~): N/A Made By: CONTRACTOR Air Content: N/A Air Temperature: N/A Cured Speoffloatlon: ASTM C-31 Speoim~fl T~mp~raturo: N/A D~to Received: 1/9/01 Oellvm'y Method: PICKED UP BY ALPHA Field DMa 8ubmlttod By: CONTRACTOR Mix DM~ Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cum Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Te~tod: (Dey~): Length Width Diameter Sq. In. Load: PSI: 179 LAB C-1231 1/12/01 7 12 N/^ 6 28.27 88133 3110 180 LAB C-617 2/2/01 28 12 N/A 6 28.27 98735 3490 181 LAB C-1231 2/2/01 28 12 N/A 6 28.27 93093 3290 182 LAB HOLD HOLD 12 N/A 6 28.27 0 ; Reeult~ to D~te: PA88 I, Note~: CLIENT MADE CYLINDERS REPORT OF FIELD 2209 Wisconsin St., Suite I00 Dollos, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 02105101 DALLAS, TEXAS PROJECT STONELEIGH (~ RIVERCHASE OUR REPORT NO. 00652-118 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~,,,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 312 02/05/01 SG/FG 2 17.5 108.5 17.5 106 98 2-A 313 02/05/01 SG/FG 2 17.5 108.5 18.4 107 98 2-A 314 02/05101 SGIFG 2 17.5 108.5 20.1 103 95 2-A 315 02/05/01 SG/FG 2 17.5 108.5 18.0 108 99 2-A 316 02/05/01 SG/FG 2 17.5 108.5 17.6 108 100 2-A 317 02/05/01 SG/FG 2 17.5 108.5 18.7 107 98 2-A 318 02/05/01 SG/FG 2 17.5 108.5 18.4 106 98 2-A TEST LOCATION: PAVING 312 40' EAST AND 50' SOUTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #G1-A 313 45' SOUTH AND 60' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #23 314 40' EAST AND 35' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD ~24 315 40' SOUTH AND 40' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #24 316 45' SOUTH AND 45' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD ~24 317 10' EAST AND 15' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD ~51-A 318 10' WEST AND 15' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD ~S1-A CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL ~ FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS '4 CEMENT TREATED D RETEST' Geotechnical Engines#rig /~ Construction Materials Testing t~ Environmental Engineering ~ Consuyng! I ' /'- REPORT OF FIELD , ,, COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite I00 % ~ / Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) , FAX: 972/406-8023 , TESTED FOR SPRING VALLEY CONSTRU(~ TION DATE 02/05/01 DALLAS, TEXAS PROJECT STONELEIGH (~ RIVERCHASE OUR REPORT NO. 00652-118 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 312 02/05101 SG/FG 2 17.5 108.5 17.5 106 98 2-A 313 02/05/01 SG/FG 2 17.5 108.5 18.4 107 98 2-A 314 02/05/01 SG/FG 2 17.5 108.5 20.1 103 95 2-A 315 02105/01 SG/FG 2 17.5 108.5 18.0 108 99 2-A 316 02/05/01 SG/FG 2 17.5 108.5 17.6 108 100 2-A 317 02~05/01 SG/FG 2 17.5 108.5 18.7 107 98 2-A 318 02/05/01 SG/FG 2 17.5 108.5 18.4 106 98 2-A TEST LOCATION: PAVING 312 40' EAST AND 50' SOUTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #G1-A 313 45' SOUTH AND 60' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #23 314 40' EAST AND 35' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD ~24 315 40' SOUTH AND 40' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD ~24 316 45' SOUTH AND 45' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD ~Y24 317 10' EAST AND 15' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD ~61-A 318 10' WEST AND 15' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD ~61-A CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL - i FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PI.ACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Geotechnical Engineering /~ Construction Materials Testing ~ Environmental Engineerng ~.