ST9801-CS 991220)~ COPPELL. TEXAS 75019
December 20, 1999
P.O. Box 478
Coppell, Texas 75019
972-462-0022
FILE
Robert Weber
Ed Bell Construction Co.
P.O. Box 540787
Dallas, TX 75354-0787
RE: ST98-01 / Coppell Road Reconstruction (SH 121 to Sandy Lake Road)
Dear R. Weber:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced location on Saturday, December 18, 1999. The
overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your
company on that date.
Please send a check for $120.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Jennifer Armstrong, Finance Director
If you should have any questions, please contact me at (972) 304-3679.
Construction Inspector
Finance Department
Debi Ingrarn, Engineering Secretary
Sent By: EBCC;
FAX (21,1) 352-3201
"'7' 2143523201;
Dec-1~-99 9:51AM; Page 2/2
TELEPHONE(214)358~581
EO BELL CONSTRUCTION COMPANY
POST OFFICE BOX 540787 10605 HARRY HINES
DALLAS. TEXAS 75354-0787 DALLAS. TEXAS 75220
· er 17, 1999
Mr. Kent
Engin
'~ 25
Coppell Road Reconstruction
SH 121 to S~ldy Lake Road
Coppefi Project #: ST 98-01
., !
/ s ; ' /
De~ Kent;
As you are aware, our utility subcontractor has been working on the 96" RCP storm sewer
extension. He has started constructing the out fall for that line and would like to complete as
much as the rip rap work as possible before the next rain event occurs. Currently, most weather
reports are predicting that the next significant rain event will occur on December 19, 1999 or
December 20, 1999; therefore, our utility subcontractor has r~qucstcd that he be permitted to
work on December 18, 1999. As a result, we request that the appropriate level of inspection be
available on that day.
If you have any questions regarding this request, don't hesitate to contact our office.
S: cerely, t~
E~ eJ onst~ ~..ionCompany
Project Engineer