Loading...
ST9801-CS 991220)~ COPPELL. TEXAS 75019 December 20, 1999 P.O. Box 478 Coppell, Texas 75019 972-462-0022 FILE Robert Weber Ed Bell Construction Co. P.O. Box 540787 Dallas, TX 75354-0787 RE: ST98-01 / Coppell Road Reconstruction (SH 121 to Sandy Lake Road) Dear R. Weber: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, December 18, 1999. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a check for $120.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Construction Inspector Finance Department Debi Ingrarn, Engineering Secretary Sent By: EBCC; FAX (21,1) 352-3201 "'7' 2143523201; Dec-1~-99 9:51AM; Page 2/2 TELEPHONE(214)358~581 EO BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS. TEXAS 75354-0787 DALLAS. TEXAS 75220 · er 17, 1999 Mr. Kent Engin '~ 25 Coppell Road Reconstruction SH 121 to S~ldy Lake Road Coppefi Project #: ST 98-01 ., ! / s ; ' / De~ Kent; As you are aware, our utility subcontractor has been working on the 96" RCP storm sewer extension. He has started constructing the out fall for that line and would like to complete as much as the rip rap work as possible before the next rain event occurs. Currently, most weather reports are predicting that the next significant rain event will occur on December 19, 1999 or December 20, 1999; therefore, our utility subcontractor has r~qucstcd that he be permitted to work on December 18, 1999. As a result, we request that the appropriate level of inspection be available on that day. If you have any questions regarding this request, don't hesitate to contact our office. S: cerely, t~ E~ eJ onst~ ~..ionCompany Project Engineer AN EQUAL OPPORTUNITY EMPLOYER