Loading...
Stoneleigh P2-LR010110 REPORT OF FIELD COMPACTION TESTS ALPHA TESTIN( , INC. 2209 Wisconsin St., Sutte 100 Dolk~ Texas 7.5229 972/620-8911 - 972/263-4937 (Metro) FAX: 972,/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 01 I10101 DALLAS, TEXAS PROJECT STONELEIGH ~ RIVERCHASE OUR REPORT NO. 00652-91 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENS~Y COMPACnON COMMENT* % PCF % PCF 288 01/10101 FG 2 17.5 108.5 18.5 104 96 1-A 289 01/10/01 FG 2 17.5 108.5 19.5 106 98 1-A 290 01110/01 FG 2 17.5 108.5 18.2 108 100 1-A 291 01/10/01 FG 2 17.5 108.5 18.9 107 99 1-A 292 01110/01 FG 2 17.5 108.5 19.1 105 97 1-A 293 01/10/01 FG 2 17.5 108.5 18.7 107 99 1-A 294 01 I10/01 FG 2 17.5 108.5 20.8 103 95 1 -A TEST LOCATION: 288 20' EAST AND 20' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #13 289 25' EAST AND 45' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #13 290 15' WEST AND 25' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #13 291 20' NORTH AND 25' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #14 292 20' SOUTH AND 60' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD #14 293 15; NORTH AND 35' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #14 294 25' SOUTH AND 30' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD #15 CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL - JAN BERTRAND, CITY OF COPPELL FILL * A. IN PI.ACE PERCENT MOISTURE AND PERCENT COMPACTION CC)MI=fY WITH SPECIFICATX)NS LIMESTABIUZED C. PE~CENTINF~c. ACE MOISTURE DOES NOT COMPt. YWrrHSPECiFiCATIONS CEMENTll~ATED D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Con§u~i~g / REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wiscor-~ St., Su#e Dolk~ Texas 75229 972/620-8911 - 972/263-4937 OVletro,) FAX: ~72./406-8Q23 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 01110/01 DALLAS, TEXAS PROJECT STONELEIGH {~ RIVERCHASE OUR REPORT NO. 00652-91A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID o~:qmu~ ~x~u¥ L~ ,N ~C~ ~N ~CE ~DEm NO. DATE DEPT~ NUMBER MOIS~JRE DRY D~NSIIY ~ DRY DENSITY COMPACTION COMMENT* 295 01110/01 FG 2 17.5 108.5 19.4 106 97 1-A 296 01/10/01 FG 2 17.5 108.5 18.8 105 97 1-A 297 01/10/01 FG 2 17.5 108.5 20.1 104 96 1 -A 298 01/10/01 FG 2 17.5 108.5 19.8 106 97 1-A 299 01/10/01 FG 2 17.5 108.5 17.8 109 100 1-A 300 01/10/01 FG 2 17.5 108.5 19.2 105 97 1-A 301 01/10/01 FG 2 17.5 108.5 19.4 105 97 1 -A TEST LOCATION: 295 20' SOUTH AND 55' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD #15 296 25' NORTH AND 20' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #15 297 15' NORTH AND 25' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #16 298 25' SOUTH AND 50' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD #16 299 20' WEST AND 25' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #16 300 PAVING - 40' EAST AND 40' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #5 301 PAVING - 50' EAST AND 35' 8OUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #5 CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL CI~4ENTll~TED D. ~ -AL~ Geotechnical Engineering · Con~ Materiels Testing · Environmental Engineering · Co REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite ~00 Dallas, Texas 75229 972/620-8911 - 972/263.4937 (Metro) FAX: ~72/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 01110/01 DALLAS, TEXAS PROJECT STONELEIGH ~ RIVERCHASE OUR REPORT NO. 00652-91B COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID Om~UM M~eUUM L~ ~ ~CE IN ~ PERCENT NO. DATE DEPT~,,~ NUMBER MOIS71JRE DRY DENSITY MOISTURE DRY DENSITY COMP^C"rloN COMMENT* 302 01/10/01 FG 2 17.5 108.5 19.1 105 96 1-A 303 01/10/01 FG 2 17.5 108.5 17.8 107 98 1-A 304 01/10/01 FG 2 17.5 108.5 18.5 105 96 1-A 305 01110/01 FG 2 17.5 108.5 17.5 107 98 1-A 306 01/10/01 FG 2 17.5 108.5 18.0 108 100 1-A 307 01/10/01 FG 2 17.5 108.5 17.5 110 101 1-A 308 01/10/01 FG 2 17.5 108.5 17.7 109 100 1-A TEST LOCATION: 302 PAVING - 25' EAST AND 35' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD 303 10' NORTH AND 15' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #G1-B 304 10' NORTH AND 35' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD ~G1-B 305 10' SOUTH AND 15' WEST FROM THE NORTHEAST CORNER OF BUILDING PAD #GI-B 306 10' SOUTH AND 10' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD ~--,1-C 307 10' SOUTH AND 40' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD ~.~1-C 308 10' NORTH AND 15' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #GI.-C CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL . FILL * A. IN PI.ACEPERCENTMOISq%IREANOPERCENTCO~PACTiONCOMPLYWlTHSPECiRCATiONS LIMEffiTABJUZED C. PERCENTIN PLACEMO~TURE DOES NOTCOMpI_YWITHSPECiFiCATtONS CEMENT'IREATED D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering ·