Loading...
Stoneleigh P2-LR001220 ALPHA TESTING, INC. Concrete Test 2209 Wisconsin St., Suite 10 , ompress,on Dallas, Texas 75229 --r -°e"or* (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-41 A'I-FN: KELLER WEBSTER Issue Date: 17J2012000 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Oesc: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: BUILDING 202 SLAB, 12'S & 12'N OF NE CORNER OF SLAB Date Placed: 11122/00 Plant Number: 7-3000 Time Placed: 11:50 AM Delivery Ticket No.: 7095438 Slump (ASTM C-143): 4 Mede By: ALPHA Air Content: NIA Cured Specification: ASTM C-31 Air Temperature: 51 Specimen Temperature: 63 Date Received: 12/4100 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By:. DODSON, RICHARD Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: TI/ted: (Days): Length Width Diameter Sq. In. Load: PSI: 37 LAB C-1231 12/6/00 14 12 N/A 6 28.27 84227 2970 38 LAB C-1231 12/20/00 28 12 N/A 6 28.27 104687 3700 39 LAB C-1231 12/20/00 28 12 NIA 6 28.27 102083 3610 40 LAB HOLD HOLD 12 NIA 6 28.27 0 ; Specifications: 28 PASS3000 I Resulte to Date: Notes: Respectfully Submitted By: - L~ of Alpha Testing, Inc. ALPHA TESTING, INC. Concrete Test 2209 Wisconsin St., Suite 10 ompress,on Dallas, Texas 75229 tDe"or* (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-42 ATTN: KELLER WEBSTER Issue Date: 12/20/2000 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Desc: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: BUILDING #202 SLAB, 20'N & 60~/OF SE CORNER OF SLAB Date Placed: 11122/00 Plant Number: 7-3000 Time Placed: 2:20 PM Delivery Ticket No.: 7095465 Slump (ASTM C-143): 4.75 Made By: ALPHA Air Content: NIA Air Temperature: 54 Cured Specification: ASTM C-31 Specimen Temperature: 67 Date Received: 12/4/00 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By:. DODSON, RICHARD Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Teated: (Days): Length Width Diameter Sq. In. Load: PSh 41 LAB C-1231 12/6/00 14 12 NIA 6 28.27 90135 3180 42 LAB C-1231 12/20/00 28 12 N/A 6 28.27 105307 3720 43 LAB C-1231 12/20/00 28 12 N/A 6 28.27 104284 3680 44 LAB HOLD HOLD 12 N/A 6 28.27 0 SpeclflcaUone: - ~-8-- -- 3000 j,Results to Date: PASg Notes: Respectfully Submitted By: ~, ~f Alpha Teac.~''~'~ ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St.. Suite 100 Dallas, Texas 75229 Report (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-43 A'I-rN: KELLER WEBSTER Issue Date: 12/20/2000 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Desc: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: BUILDING f~202 SLAB, 12'N & 45'E OF SW CORNER OF SLAB Date Placed: 11/22/00 Plant Number: 7-3000 Time Placed: 3:40 PM Delivery Ticket No.: 7095477 Slump (ASTM C-143): 5 Made By: ALPHA Air Content: N/A Air Temperature: 52 Cured Specification: ASTM C-31 Specimen Temperature: 65 Date Received: 12/4100 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: DODSON, RICHARD Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESUL TS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI: 45 LAB C-1231 12/6/00 14 12 N/A 6 28.27 94891 3350 46 LAB C-1231 12/20/00 28 12 N/A 6 28.27 114349 4040 47 LAB C-1231 1 2/20/00 28 12 N/A 6 28.27 110169 3890 48 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3000 Results to Date: PASS Notes: REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 W/scons/n St., Su#e 100 E)ollos, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 12/20/00 DALLAS, TEXAS PROJECT STONELEIGH (~ RIVERCHASE OUR REPORT NO. 00652-87 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID O~MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~ NUMBER MOISTURE DRY DENS~rY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 175 12/20100 FG 2 17.5 108.5 18.8 107 99 1-A 176 12/20/00 FG 2 17.5 108.5 20.8 104 96 1-A 177 12/20/00 FG 2 17.5 108.5 20.3 105 96 1-A 178 12/20/00 FG 2 17.5 108.5 19.5 106 97 1-A 179 12/20/00 FG 2 17.5 108.5 18.8 107 99 1-A 180 12/20/00 FG 2 17.5 108.5 21.2 103 95 1-A 181 12/20/00 FG 2 17.5 108.5 18.7 107 99 1-A TEST LOCATION: 175 20' NORTH AND 30' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #7 176 15' SOUTH AND 70' EAST FROM THE NORTHWEST CORNER OF BUILDING PAD #7 177 15' NORTH AND 30' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #7 178 15' EAST AND 25' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 179 20' EAST AND 65' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #10 180 15' WEST AND 30' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #10 181 PAVING - 35' EAST AND 25' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #5 CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL FILL * A. IN PLACE PERCENT MO~TURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS NATURAL ~UBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH S~ECIFICATIONS ' LIME ~TABILIZED C. PERCENT IN PLACE~ MOISTURE DOES NOT COMPLY WITH S~ECIFICATIONS CEMENt'TREATED O. R~ Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.. Suite I00 ~)ollos, Texos 70229 972/620-8911 - 972/263-4937 OVletro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 12/20/00 DALLAS, TEXAS PROJECT STONELEIGH ~ RIVERCHASE OUR REPORT NO. 00652-87A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLAC[c IN PLACE PERCENT NO. DATE DEPT~,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 182 12/20/00 FG 2 17.5 108.5 20.5 106 97 1-A 183 12/20/00 FG 2 17.5 108.5 20.9 105 97 1-A 184 12/20/00 FG 2 17.5 108.5 19.1 107 99 1-A 185 12r20/00 FG 2 17.5 108.5 20.6 104 96 1-A 186 12220/00 FG 2 17.5 108.5 19.7 106 97 1-A 187 12/20/00 FG 2 17.5 108.5 21.5 104 96 1-A 188 12/20/00 FG 2 17.5 108.5 20.0 106 98 1-A TEST LOCATION: 182 PAVING - 45' EAST AND 30' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD ~4 183 PAVING - 20' EAST AND 35' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD ~4 184 PAVING - 20' NORTH AND 20' WEST FROM THE NORTHWEST CORNER OF BUILDING PAD #G-2 185 PAVING - 35' SOUTH AND 25' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #3 186 PAVING - 35' SOUTH AND 20' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD #2 187 PAVING - 30' SOUTH AND 15' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD ~2 188 PAVING - 45' WEST AND 30' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #1 CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAN, D, CITY OF COPPELL ~ Fill A. IN II=f. ACE PERCENT MO~S'rURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS NATURAL SUBGRADE B. PERCENT ~11ON DOES NOT CO~PLY WITH SPECIFICATIONS UME ST~M~LIZED C. PERCENT IN II[ACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Cl;MENTTRF~TED D. R~ - Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Con4ultir~ ·