Loading...
Stoneleigh P2-LR001219 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 10Concrete Compression Test Dallas, Texas 75229 (972) 620-8911 Report Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-59 ATTN: KELLER WEBSTER Issue Date: 12/19/2000 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Desc: STONELEIGH Q RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: GARAGE SLAB G-2, 10'S OF NW CORNER Date Placed: 12/8/00 Plant Number: 7-3000 Time Placed: 9:00 AM Delivery Ticket No.: 7096072 Slump (ASTM C-143): N/A Made By: CONTRACTOR Air Content: N/A Air Temperature: N/A Cured Specification: ASTM C-31 Specimen Temperature: N/A Date Received: 12/11100 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By:. CONTRACTOR Mix Data Submlttad By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI: 91 LAB C-1231 12/15/00 7 12 N/A 6 28.27 92652 3270 92 LAB 1/5/01 28 12 N/A 6 28.27 0 93 LAB 1/5/01 28 12 N/A 6 28.27 0 94 LAB HOLD HOLD 12 N/A 6 28.27 0 ! Specifications: 28 3000 Results to Data: N/A Notes: CLIENT MADE CYLINDERS i. ' Respectfully Submitted By: .~/ of Alpha Testing. Inc. '-'i ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911- 972/263-4937 (Metro) DAILY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 12/19/00 DALLAS, TEXAS PROJECT: STONELEIGH (~ RIVERCHASE OUR REPORT NO: 00652-62 COPPELL, TEXAS TECHNICIAN: G.M. WEATHER: CLEAR TEMPERATURE RANGE: THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 6 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATION: SET #1: NORTHEAST END OF BUILDING #1 SET #2: SOUTH END OF BUILDING #5 SET #3: BREEZEWAY AREA MIDDLE OF BUILDING #1 SET #4: BREEZEWAY AREA MIDDLE OF BUILIDNG #5 SI~T #5: SOUTHEAST END OF BUILDING #1 SET #6: NORTH END OF BUILDING #5 THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL STING~ Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting