Loading...
Stoneleigh P2-LR001204 ALPHA TESTING, INC. 2209 Wisconsin St., Suite Dallas, Texas 75229 972/620-8911- 972/263-4937 (Metro) DAILY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 12/04100 DALLAS, TEXAS PROJECT: STONELEIGH ~;~ RIVERCHASE OUR REPORT NO: 00652-46 COPPELL, TEXAS TECHNICIAN: G.M. WEATHER: CLOUDY TEMPERATURE RANGE: 58 TO 58 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED, WHILE THERE THE TECHNICIAN DELIVERED I CASE OF EMPTY MOLDS. THE TECHNICIAN OBTAINED 3 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: GREENBRIAR - BUILDING 3.04 AT 70 YDS. SET #2: GREENBRIAR - BUILDING 3.04 AT 160 YDS. SET #3: GREENBRIAR - BUILDING 3.04 AT 240 YDS. THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallos, Texos 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 12/04100 DALLAS, TEXAS PROJECT STONELEIGH (~ RIVERCHASE OUR REPORT NO. 00652-44 COPPELL. TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 267 12104/00 SG/FG 2 17.5 108.5 17.7 106 98 2-A 268 12/04100 SG/FG 2 17.5 108.5 19.6 105 96 2-A 269 12/04/00 SG/FG 2 17.5 108.5 19.7 108 100 2-A 270 12/04100 SGIFG 2 17.5 108.5 21.2 103 95 2-A 271 12104/00 SG/FG 2 17.5 108.5 17.8 108 100 2-A 272 12104/00 SGIFG 2 17.5 108.5 19.3 106 98 2-A 273 12/04/00 SG/FG 2 17.5 108.5 20.6 104 96 2-A TEST LOCATION: 267 PAVING - 35' SOUTH AND 40' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #10 268 PAVING - 30' SOUTH AND 80' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #7 269 PAVING - 30' SOUTH AND 120' WEST FROM THE SOUTHEAST CORNER OF BUILDING PAD #7 270 PAVING - 40' SOUTH AND 35' EAST FROM THE SOUTHWEST CORNER OF BUILDING PAD ~6 271 20' EAST AND 25' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #6 272 25' WEST AND 45' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD ~ 273 20' EAST AND 25' SOUTH FROM THE NORTHWEST CORNER OF BUILDING PAD #6 CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL - Geotechnmal Engineering ~ Construction Materials Testing ~ Environmental Engineering ~' Consul~in