Loading...
Stoneleigh P2-LR001130 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Vtr~consln St., Suite 100 Dallas, Texas 7~229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 11/30/00 DALLAS. TEXAS PROJECT STONELEIGH ~ RIVERCHASE OUR REPORT NO. 00652-37 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 261 11/30/00 FG 2 17.5 108.5 19.2 104 96 1-A 262 11/30/00 FG 2 17.5 108.5 21.1 104 96 1-A 263 11/30/00 FG 2 17.5 108.5 19.7 106 97 1-A 264 11/30100 FG 2 17.5 108.5 21.2 104 96 1 -A 265 11/30/00 FG 2 17.5 108.5 18.5 108 100 1-A 266 11/30/00 FG 2 17.5 108.5 20.8 106 97 1 -A TEST LOCATION: 261 20' WEST AND 25' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 262 20' WEST AND 55' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 263 15' EAST AND 25' SOUTH FROM THE NORTHWEST CORNER OF BUILDING PAD #11 264 25' EAST AND 20' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 265 20' EAST AND 45' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 266 20' WEST AND 15' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #5 CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL - JAN BERTRAND, CITY OF COPPELL 1. FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST Geotechnical Engineering · Construction Materials Tosting · Environmental Engineenng REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 220914r~consin St., Suite 100 Do#os. Texos 70229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 11/30/00 DALLAS, TEXAS PROJECT STONELEIGH ~ RIVERCHASE OUR REPORT NO. 00652-37 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~ NUMBER MOISTURE DRY D~NSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 261 11/30/00 FG 2 17.5 108.5 19.2 104 96 1-A 262 11/30/00 FG 2 17.5 108.5 21.1 104 96 1-A 263 11/30/00 FG 2 17.5 108.5 19.7 106 97 1-A 264 11/30/00 FG 2 17.5 108.5 21.2 104 96 1-A 265 11/30/00 FG 2 17.5 108.5 18.5 108 100 1-A 266 11/30/00 FG 2 17.5 108.5 20.8 106 97 1-A TEST LOCATION: 261 20' WEST AND 25' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 262 20' WEST AND 55' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 263 15' EAST AND 25' SOUTH FROM THE NORTHWEST CORNER OF BUILDING PAD #11 264 25' EAST AND 20' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 265 20' EAST AND 45' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 266 20' WEST AND 15' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #5 CC: LARRY DAVIS, CITY OF COPPELL - LANNY ALLISON, CITY OF COPPELL - / 1.FILL wA IN PLACE PERCENT IVlO~.~I~RE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRAOE B PERCENT COMPACTK:)N DOES NOT COMPLY WITH SPECIFICATIONS 3.LIME STABILIZED C PERCENT IN PLACE MOISTURE DO~$ NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D RETEST '~'AL~T~SI~I~I I~cO~ ~ Geotechnical Engineering · Construction Materials Testing · Environmental Engineering REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Vtr~consin St., Suite 100 Dallas. Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 11/30/00 DALLAS, TEXAS PROJECT STONELEIGH ~ RIVERCHASE OUR REPORT NO. 00652-37 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 261 11/30/00 FG 2 17.5 108.5 19.2 104 96 1-A 262 11/30/00 FG 2 17.5 108.5 21.1 104 96 1-A 263 11130/00 FG 2 17.5 108.5 19.7 106 97 1 -A 264 11/30/00 FG 2 17.5 108.5 21.2 104 96 1 -A 265 11/30/00 FG 2 17.5 108.5 18.5 108 100 1-A 266 11/30/00 FG 2 17.5 108.5 20.8 106 97 1 -A TEST LOCATION: 261 20' WEST AND 25' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 262 20' WEST AND 55' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 263 15' EAST AND 25' SOUTH FROM THE NORTHWEST CORNER OF BUILDING PAD #11 264 25' EAST AND 20' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD ~5 265 20' EAST AND 45' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 266 20' WEST AND 15' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #5 CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL . ,/ 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS II/I REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite I00 Do#os, Texas 76229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR SPRING VALLEY CONSTRUCTION DATE 11/30/00 DALLAS, TEXAS PROJECT STONELEIGH t~ RIVERCHASE OUR REPORT NO. 00652-37 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~,~ NUMBER MOISTURE DRY D~NSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PGF 261 11/30/00 FG 2 17.5 108.5 19.2 104 96 1-A 262 11130/00 FG 2 17.5 108.5 21.1 104 96 1-A 263 11/30100 FG 2 17.5 108.5 19.7 106 97 1-A 264 11/30/00 FG 2 17.5 108.5 21.2 104 96 1-A 265 11/30/00 FG 2 17.5 108.5 18.5 108 100 1-A 266 11/30/00 FG 2 17.5 108.5 20.8 106 97 1 -A TEST LOCATION: 261 20' WEST AND 25' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 262 20' WEST AND 55' NORTH FROM THE SOUTHEAST CORNER OF BUILDING PAD #11 263 15' EAST AND 25' SOUTH FROM THE NORTHWEST CORNER OF BUILDING PAD #11 264 25' EAST AND 20' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 265 20' EAST AND 45' NORTH FROM THE SOUTHWEST CORNER OF BUILDING PAD #5 266 20' WEST AND 15' SOUTH FROM THE NORTHEAST CORNER OF BUILDING PAD #5 CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL ·~r/gT~~,~' .~/ 1. FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBORADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS pe 3. LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENT TREATED D RETEST /' ~'"'- Geotechnical Engineering · Construction Marshals Testing · Environmental Engineering ~