Loading...
Stratford Manor-CS 950831 DEVELOPMENT REVIEW COMMI'I'I 'E ENGINEERING COMMENTS ITEM: Fatatts o1' DeForest Road. lqnal Plat. to allow the development of a 16 lot resident~ planned de~eloptncnt ~n, located on the north side of DeForest Road; west of Cambridge Manor Lane, at the request of ~pton Engineering, Inc. DRC DATE: August 31, 1995 and September 7, 1995 CONTACT: Ken G~ffin, P.E., Assh~a~ C~y Manager/C~y En~neer 00~3679) · · COMMENT STATUS: ~PRELIMINARY I~NAL SUBSEOUENT TOP&Z · 1. The Floodplain Reclamation study will need to be reviewed and approved by both the City and FEMA prior to any work on the property. If you are proposing structures in the floodplain they should be modeled in the study or they will not be allowed. 2. Please show the correct location of the 100-year floodplain as per the official FEMA maps. If the study is approved prior to filing the plat, then the revised floodplain can be shown on the face of the plat prior to filing. 3. A variance request must be made for deletion of alleys. DEVELOPMENT R i .VIEW COMMITTEE ENGINEERING COMMENTS ITEM: Estates of DeForest ~ Pre~ Plat. to allow tke development of a 16 lot residential planned development subdDi~n, located on tire north side of DeForest Road; west of Cambridge Manor Lane, at the request of ~uton Engineering, Inc. DRC DATE: August 31, 1995 and September 7, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: ~PRELIMINARY FINAL SUBSEOUENT TO P&Z · Preliminary Plat Comments: 1. The Floodplain Reclamation study will need to be reviewed and approved by both the City and FEMA prior to any work on the property. If you are proposing structures in the floodplain they should be modeled in the study or they will not be allowed. 2. Please show the correct location of the 100-year floodplain as per the official FEMA maps. 3. A sidewalk easement will be required if the sidewalks are going to meander as shown in the landscape plans. 4. Cambridge Manor as built plans show a proposed retaining wall behind Lots 1-5. Is this to be eliminated when Creekside Estates is constructed? 5. Show adjacent property zoning. DEVELOPMENT ~VIEW COMMYITEE ENGINEERING COMMENTS ITEM: PI~I4gI~ Eg~es of DeFor~g Roa~ zon~g change ~m A (~~) ~ P~F-12 (~ ~e~~ S~g~ F~I2) for ~s of ~Fo~ ~ ~d on ~e ~ ~ of ~Fo~ ~ ~eg of ~~e M~r ~e, ~ ~ ~e~ of ~n En~e~g, DRC DATE: Augu~ 31, 1995 and Sep~q~ber 7, 1995 CONTACT: Ken Gd~ P.E., As~m~ C~ Manager/C~ Enghteer ($0~$679) · · COMMENT STATUS: ~PRELIMINARY FINAL SUBSEOUENT TO P~Z No comments.