Loading...
Summit P2-CS 970724Jul, 24. 1997 214 871 6656 10:56AM FULTS ASSOCIATES THE FULTS COMPANIES 400 N CENTRAL EXPRESSWAY, 5TH FLOOR DALLAS, TEXAS 7523 I OFFICE: 214/871-6666 FAX: 214/871-6665 No. /29 2/3 FOLTSONCOR July 24, 1997 Mr. Ken GritTm City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Summit at thc Springs Coppell, Texas Dear Ken: Per our recent conversations, we understand that three (3) items remain prior to final approval on the referenced project by the City of Coppell. These items are as follows 1. Concrete sidewalk needs to be installed in the public area in the hammerhead cul-de-sac between lots 31 and 34. As we discussed, we originally planned to have the builders on lots 31 and 34 construct the intervening sidewalk in order to prevent damage to the sidewalk during the home construction phase. We will, however, proceed at this time with our site developmem contractor to provide this sidewalk. I will be meeting on site with Marie Sinacola & Sons on July 24, to proceed with this work. We would anticipate that this work would be completed no later than August 31, 1997. 2. Retaining wall needs to be installed along the alley at the outfall of the storm sewer line. Dowdey Anderson indicates the retaining wall has been constructed along the alley per the city comments. I have left a voice message with your field inspector, Oarreth Campbell, to review the installation and advise on any additional work which may be required. Upon receipt of any additional information, we will immediately proceed with modifications. 3. Erosion control bond needs to be provided. Per our telephone conversation you indicated the erosion control bond could either be an assurity bond, a certificate of deposit, a letter of credit, or a cash deposit held for two years. I have advised our client, Baptist Foundation of Texas, of these options in meeting this requirement. As I indicated, my discussions with our typical bonding companies indicated that no bonding company typically writes erosion control bonds. We will be forwarding appropriate documentation meeting one of these requirements to you early next week for this erosion control bond. Jul. 24. 1997 ]0:57AM Mr. Ken Griffin July 24, 1997 Page 2 214 871 6656 ASSOCIATES No. 9129 P, 2/3 Ken, we appreciate your assistance in working with us on this project. We understand that, based on our agreement to proceed with the above, building permits will be released in the project. It is noted however, in the event we do not complete the above items prior to completion of house constructions, the certificate of occupancy will not be granted until these items arc complctc. Should you have any questions, do not hesitate to contact me. Sincerely, FUI.T$ONCOR Bruce R. Heller Vice President BRH:kks cc: Mike Wagner Bill Anderson