Loading...
Summit P2-CS 970723TO:' From: RE: Date: MEMORANDUM Greg Jones, Chief Bldg. Official, Building Inspections Atul Patel, E.I.T., Graduate Engineer, Engineering Dept. Summit at the Springs Phase 2 July 23, 1997 The final plat of Summit at the Springs Phase 2 indicates the approximate limits of the 100 year floodplain in accordance with F.I.R.M. map dated April 15, 1994 community panel number 480170-0010E. There are various lots that are unbuildable because the 100 year floodplain encompasses a majority or all of the lots until they are reclaimed out of the floodplain. At the present time, the City has not received a letter of map revision from F.E~M.A. for reclaiming lots 30, 31, 34, 41, 42, and 43 Block B out of the 100 year floodplain. See attached map. Therefore, I am requesting that no building permits be issued for the above lots in question until a final letter of map revision is received from FEMA. If you have any questions, let me know ap Attachment: summit.797 Summit @ Springs final plat Phase 2.