Summit P2-CS 970723 (2)To'
From:
RE:
Date:
MEMORANDUM
Greg Jones, Chief Bldg. Official, Building Inspections
Ami Patel, E.I.T., Graduate Engineer, Engineering Dept.
Summit at the Sprin~s Phase 2
July 23, 1997
The final plat of Summit at the Springs Phase 2 indicates the approximate limits of the 100 year
floodplain in accordance with F.I.R.M. map dated April 15, 1994 community panel number
480170-0010E. There are various lots that are unbuildable because the 100 year floodplain
encompasses a majority or all of the lots until they are reclaimed out of the floodplain. At the
present time, the City has not received a letter of map revision from F.E.M.A. for reclaiming
1~ 3_~1, 3__4, 4~1, ~ and 43 Block B out of the 100 year floodplain. See attached map.
Therefore, I am requesting that no building permits be issued for the above lots in question until
a final letter of map revision is received from FEMA.
If you have any questions, let me know
Attachment:
summit.?9'/
Sumnlit 1~ Springs final plat Phase 2.