Loading...
WA9601A-CS000103 SHIMEK, JACOBS & FINKLEA, L.L.P. t'A"' t, 0t/L CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. January 3, 2000 I. C. FINKLEA, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake Road Water Line Final Engineering Services Statement Dear Mr. Griffin: Please find enclosed Statement Number 96150 (AR), dated January 03, 2000 for professional engineering services provided through December 31, 1999 on the Sandy Lake Road Water Line project (Project WA -96- 01A). The basic services for general construction administration is now 100 percent complete and paid in full as of the date of this letter. The Special Services for the Re-design of Sandy Lake Road Water Line portion of the statement reflects the work required to complete the re-alignment of the Sandy Lake Road Water Line. This work was authorized by an amendment to our agreement dated April 20th, 1999. Our amendment provided for compensation for the extra work based on actual salary cost times a multiplier of 2.35 and expenses at actual invoice amount times 1.15. Based on our knowledge of the project requirements at that time, we suggested the City budget an amount in fne range of $6,000 to $6,500. From our total man-hour expenditures and expenses incurred, our final billing for this work totaled $13,010.05. The re-design effort exceeded our original estimate primarily due to the following: 1. In order to place the proposed water line just inside the north property line of Wagon Wheel Ranch Park, we had to re-establish the north boundary of the park property 2. The densely wooded area required more survey time than initially estimated. 3. Our original re-alinged route had to be walked out and adjusted twice for tree mitigation. This required an extensive and time consuming tree survey and field time for the design engineer. 4. The water line alignment at the intersection of State Road and Grapevine Creek and along the east side of State Road was more complicated and required more design time than initially conceived. 5. Negotiating the change order with the contractor exceeded our original time effort estimate. j:\clerical\coppell\96-150\letlers\const\k\coppell 96150_final statement.doe Mr. Kenneth M. Griffin, P.E. City of Coppell Page Number 2 January 3, 2000 We are enclosing a summary of our man-hours and expenses for your review and respectfully request the City of Coppell consider an extension of our amended agreement revising the contract amount for the redesign of the Sandy Lake Road Water Line to an amount not to exceed $13,010.05. We are available to discuss this project and this request for a contract amendment further at your convenience. Enclosures Gary C. Hendricks, P.E. SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 City of Coppell Date: January 3, 2000 Post Office Box 478 Coppel], Texas 75019-0478 Attention: Mr. Kenneth M. Griffin, P.E. StatementNo. 96150 (AR) SPECIAL SERVICES - REDESIGN OF SANDY LAKE ROAD WATERLINE Time of Personnel: Engineer 37.0 Hrs $ 3,821 84 Engineer in Training 15.0 Hrs 1,086 44 AutoCAD Technician I 17.5 Hrs 1,363 59 AutoCAD Technician II S7.0 Hrs 3,284 20 Draftsman 3.0 Hrs 51 75 Word Processor 3.0 Hrs 124 23 Survey 39.0 Hrs 2,111 71 Survey 36.5 Hrs 1,005 89 208.0 Hrs. $12,849.65 Expense: Automobile $ 153.30 Printing .17 Special Supplies 6.93 160.40 Total Billed - 100% Complete $13,010.05 Less Previous Payments 6,500.00 Total Amount Due $ 6,SiO.OS