Loading...
Summit P2-CS 970122 (3) Texas 75019 ~f4-462-0022 Bruce Heller Fults Co. 9400 North Central Expressway, 5th Floor Dallas, TX 75231 Summit at the Springs, Phase II Development Fee Assessment January 22, 1997 Dear Mr Heller: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $39,520.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, KennSth M. Griffin, P.E. Director of Public Works/City Engineer CC: Je~mifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services D VELOPMENT FEE TABL Project: Date: Summit at the Springs, Phase H 1/22/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,850.00 $5,850.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $650.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $301.73 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $390.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $5,850.00 $5,850.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $650.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $650.00 (100% due at Issuance of Building Permit) Park Fee $16,705.00 $16,705.00 (100% due prior to Council Approval) Roadway Impact Fee $11,115.00 $11,115.00 (100% due prior to Council Approval) Street Light Fee Assessed (100% due prior to Acceptance of Project in Phase 1 Street Sign Fee Assessed (100% due prior to Acceptance of Project in Phase I Construction Inspection Fee Assessed in Phase 1 TOTAL $42,161.73 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $39,520.00 DEVELOPMENT FEE WORKSHEE, PROJECT: Summit at the Springs, Phase H DATE: 1/22/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 13 - 5/8 inch X 3/4 inch -- 13 ESU's 0 - 5/8 inch X 3/4 inch = 0 ESU's = ESU's 0 - N/A = ESU's Total #: 13 ESU's @ $450.OO ea. (1OO% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 13 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 13 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (1OO% due prior to issuance of water meters) $23.21 Water Meter Deposit Fee (Domestic): Total #: 13 Meter(s) @ 030.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (lOO% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 13 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 13 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 13 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $5,850.00 ~650.OO $301.73 $0.00 $0.00 $0.00 $390.00 $0.00 $5,850.00 $650.00 $650.00 Page 1 DEVELOPMENT FEE WORKSHEE m Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 13 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lightin§ plan for the proposed development. Once the plans are submitte0, $292.60 per Ii§hr will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $16,705.00 N/A $11,115.00 Assessed in Phase 1 Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Assessed in Phase 1 Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the En§ineerin§ Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Assessed in Phase 1 Page 2 ROADV~AY IMPACT FEE CALCULA~I'iONS PROJECT: DATE: Summit at the Springs, Phase H 1/22/97 ROADWAY IMPACT FEE: Service Area * 5 Residential Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Single-Family Detached N/A 13 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $11,115.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)