Loading...
Summit P2-CS 961126DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENT$ ITEM: DRC DATE: CONTA CT: summit at the Spring~ Plum II. lrmal Plat. to atlo~ the development of 13 residential lots as the final phase of a residential ~n, located on the south side of Bethel Road, approximately 1000' west of Denton Tap, at the request of Dowdey, Anderson & Associates, Inc. November 26, 1996 and December 5, 1996 Mike Martin, E. L T., Assistant City Engineer (304-3679) COMMENT STATUS: ~'PRELIMINARY 1. Please label all common areas, such as 32X, 33X, 41X. 2. Lot number for 41X should be changed to avoid confusion with Lot 41 adjacent to it. 3. Floodplain note should be revised to state "The City will have no responsibility of maintenance of the floodway/floodplain". Also, add sentence that states "No fences will be allowed in the floodplain along with any other structures as per the City's Floodplain Ordinance." 4. Consideration should be given to including a portion of Lot 31 into Lot 32X.