Loading...
Summit P1-CS 961002To: Greg Jones, Chief Building Official, Building Inspections Dept. From: Ami Patel, E.I.T. a~' Summit At The Springs Block A Lot 2 Date: October 2, 1996 The Summit of the Springs Phase 1 development has an existing 24" sanitary sewer line running north on lot 2 of Block A. A proposed 8" sanitary sewer line connects to an existing manhole on the lot also. The plat is showing an existing 20' sanitary sewer easement for the 24" sewer line. A 20' sanitary sewer easemem will be dedicated for the portion of the proposed 8" sanitary sewer line that will fall on Lot 2. The easements cannot be encroached by the house, or any future structures like pools, decks, sheds, etc. Please make sure that the builders are aware of the requiremem before the building permit is issued. I have attached the water and sewer plan for Lot 2 Block A of Summit At The Springs for your informationi If you have any questions, let me know. Thanks Enclosure: Water and Sewer plan for Lot 2, Blk A Summit At The Springs ap LN.