Summit P1-CS 960828he City With A Beautiful Future
Bruce Heller
Fults Co.
9400 North Central, 5th Floor
Dallas, TX 75231
Summit at the Springs
Development Fee Assessment
P.O. Box 478
Coppell, Texas 75019
214-462-0022
August 28, 1996
Dear Mr Heller:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $173,950.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Kent.- M. Oh'if[m; P.E.
Assistant City Manager/City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Summit at the Springs
Date: 8/28/96
TOTAL AMOUN'F~ DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $31,500.00 $31,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $3,000.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,276.55
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $193.20
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,650.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $175.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $24,750.00 $24,750.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,750.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,750.00
(100% due at Issuance of Building Permit)
Park Fee $70,675.00 $70,675.00
(100% due prior to Council Approval)
Roadway Impact Fee $47,025.00 $47,025.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
$185,744.75
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $173,950.00
I
DEVELOPMENT FEE WORKSHEET
PROJECT: Summit at the SptOtgs
DATE: 8/28/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
55 - 5/8 inch X 3/4 inch -- 55 ESU's
4 - I inch = 10 ESU's
1 - I 1/2 inch = 5 ESU's
0 N/A = ESU's
Total #: 70 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap lnapection Fee:
Total #: 60 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 55 Domestic Meter(s) @ $23.21
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 4 Irrigation Meter(s) @
Total #: I Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$48.3O
$134.93
Water Meter Deposit Fee (Domestic):
Total #: 55 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 5 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
55
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 55 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 55 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$31,500.00
$3,ooo.oo
$1,276.55
$193.20
$134.93
$0.00
$1,650.00
$175.oo
$24,750.00
$2,750.00
$2,750.00
Page I
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
55
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$70,675.00
N/A
$47,025.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
{4% of development cost required for public improvements)
Need submiual of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Summit at the Springs
DATE: 8/28/96
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Residential
Land Use **
Building Size (Scl. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due -- (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) --
Detached
N/A
55
2.85
$300
$47,025.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)