Loading...
Summit P1-CS 960828he City With A Beautiful Future Bruce Heller Fults Co. 9400 North Central, 5th Floor Dallas, TX 75231 Summit at the Springs Development Fee Assessment P.O. Box 478 Coppell, Texas 75019 214-462-0022 August 28, 1996 Dear Mr Heller: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $173,950.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Kent.- M. Oh'if[m; P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Summit at the Springs Date: 8/28/96 TOTAL AMOUN'F~ DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $31,500.00 $31,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,000.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,276.55 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $193.20 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,650.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $175.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $24,750.00 $24,750.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $2,750.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $2,750.00 (100% due at Issuance of Building Permit) Park Fee $70,675.00 $70,675.00 (100% due prior to Council Approval) Roadway Impact Fee $47,025.00 $47,025.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts $185,744.75 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $173,950.00 I DEVELOPMENT FEE WORKSHEET PROJECT: Summit at the SptOtgs DATE: 8/28/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 55 - 5/8 inch X 3/4 inch -- 55 ESU's 4 - I inch = 10 ESU's 1 - I 1/2 inch = 5 ESU's 0 N/A = ESU's Total #: 70 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap lnapection Fee: Total #: 60 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 55 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 4 Irrigation Meter(s) @ Total #: I Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $48.3O $134.93 Water Meter Deposit Fee (Domestic): Total #: 55 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 5 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 55 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 55 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 55 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $31,500.00 $3,ooo.oo $1,276.55 $193.20 $134.93 $0.00 $1,650.00 $175.oo $24,750.00 $2,750.00 $2,750.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 55 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $70,675.00 N/A $47,025.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) {4% of development cost required for public improvements) Need submiual of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Summit at the Springs DATE: 8/28/96 ROADWAY IMPACT FEE: Service Area * 5 Category ** Residential Land Use ** Building Size (Scl. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due -- (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- Detached N/A 55 2.85 $300 $47,025.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)