Loading...
Summit P1-CS 960821The City With A Beautiful Future Bruce Heller Fults Co. 9400 North Central, 5th Floor Dallas, Tx. 75231 P.O. Box 478 Coppell, Texas 75019 214-462-0022 August 21, 1996 Summit ~ the Springs Development Fee Assessment Dear Mr Heller: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $103,275.00 and forward to the Finance Department along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griff'm, P.E. Assistant City Manager/City Engineer cc: Bill Anderson, P.E., Dowdey Anderson & Associates, Inc. Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEES TABLE Project: Summit @ the Springs Date: 8/21/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $31,500.00 $31,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,000.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,276.55 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $193.20 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,650.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $175.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $24,750.00 $24,750.00 (1009; due prior to Council Approval) Wastewater'Tap Inspection Fee $2,750.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $2,750.00 (1009; due at Issuance of Building Permit) Park Fee $70,675.00 $70,675.00 (1009; due prior to Council Approval) Roadway Impact Fee $47,025.00 $47,025.00 (1009; due prior to Council Approval) Street Light Fee Information not (1009; due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts $115,069.75 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $103,275.00 DEVELOPMENT FEE WORKSHEET PROJECT: Summit ~ the Springs DATE: 8/21/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 55 - 5/8 inch X 3/4 inch -- 55 ESU's 4 - I inch -- 10 ESU's 1 - I 1/2 inch = 5 ESU's 0 N/A = ESU's Total #: 70 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 60 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 55 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 4 Irrigation Meter(s) @ Total #: 1 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $48.30 $134.93 Water Meter Deposit Fee (Domestic): Total #: 55 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 5 Meter(s) ~ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 55 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 55 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 55 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $31,500.00 $3,000.00 $1,276.55 $193.20 $134.93 $0.00 $1,650.00 $175.00 $24,750.00 $2,750.00 $2,750.00 Page 1 D~-VELOPMENT FEE WORKSHEE r Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 55 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $70,675.00 N/A $47,025.00 Information not available at this t/me Street Sign Fees: Assessed for signage in tho City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: ~ Summit 0 the Springs 8/21/96 ROADWAY IMPACT FEE: Service Area * Cat~gory ** Land Use ** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = 5 Residential Sin~le-Famil), Detached N/A 55 2.85 $300 $47,025.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)