Loading...
Summit P1-CS 960516CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT SUMM AT THE SPRINGS, PRELIM ARY PLAT P & Z HEARING DATE: May 16, 1996 C.C. HEARING DATE: June 11, 1996 LOCATION: South side of Bethel Road, approximately 500' west of Denton Tap Road SIZE OF AREA: 29.88 acres; 70-lot subdivision CURRENT ZONING: PD-SF-9 REQUEST: Preliminary Plat approval APPLICANT: Baptist Foundation of Texas 1601 Elm St.,//1700 Dallas, TX 75201-7241 (214) 978-3333 FAX (214) 978-3397 Representative: Dowdey, Anderson & Assoc. 16250 Dallas Parkway #100 Dallas, TX 75248 (214) 931-0694 FAX (214) 929-1241 HISTORY: The City Council approved the planned development, single- family-9 zoning on February 27, 1996. TRANSPORTATION: Bethel Road is a 2-lane undivided asphalt wad with side ditches in a 50'-wide right-of-way, proposed to be a C2U collector street within a 60'-wide right-of-way from Coppell Road to Grapevine Creek and within a 90' right-of-way from Grapevine Creek to Denton Tap Road. Item # 8 SURROUNDING LAND USE & ZONING: North South - East West Vacant; "C"- Commercial Zoning Elementary School, School District Administrative and Maintenance Facilities; ~C"- Commercial Zoning Vacant; "PD-LI"- Planned Development, Light Industrial Zoning Vacant, Grapevine Springs Park; "PD-LI'-Planned Development, Light Industrial Zoning COMPREHENSIVE PLAN: The 1987 Plan showed a special use district. The revised proposal suggests a residential use. DISCUSSION: The approved Planned Development site plan showed a total of 74 residential lots while this preliminary plat is showing a total of 70 lots. The reduction of 4 lots was to mitigate the potential problems with certain cul-de-sacs which could pose problems to fire trucks. The applicant needs to make a number of minor corrections to the plat, landscape and elevation plan such as show the type and quantity of planting material going to be used at the subdivision entry, provide dimensions of the proposed subdivision sign and comply with the engineering comments. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the preliminary plat subject to the following conditions being met: 1) Provide a complete listing of quantity of planting material to be used at the subdivision entry. 2) 3) Provide elevations of proposed subdivision signage showing dimensions of the lettering. Comply with engineering comments. ALTERNATIVES: ATTACHMENTS: 1) Recommend approval of the Preliminary Plat 2) Recommend disapproval of the Preliminary Plat 3) Recommend modification of the Preliminary Plat 4) Continue the Hearing 1) Preliminary Plat 2) Tree Survey 3) Preliminary Entry Development 4) Engineering Comments Item # 8 DEVELOPMENT VIEW COMMI EE ENGINEERING COMMENTS Summit at the Springs. Preliminary_ Plat. to allow the development of a 70-1or single-family residential subdivision on 29.88 acres of property, located on the south side of Bethel Road, approximately 500' west of Denton Tap Road at the request of Dowdey, Anderson and Assoc. DRC DATE: April 25, 1996 and May 2, 1996 CONTACT:.. l~d~e Martin, E.I. T., AssistmU City Engineer 004-$679) COMMENT STATUS: Landscaping Plans: The Preliminary Entry Development East Entry Scheme 2 shows the roadway coming off of Bethel Road to be 15 feet in width, however, the plat shows 21 feet in width. These should be consistent. Also, the exit should be a minimum of 25 feet in width. These are informational comments and should have no bearing on the approval of the plat: 1. Some type of slope protection may be required in the bend of Grapevine Creek adjacent to lot 45, Block B and Lot IX, Block A. 2. A floodplain reclamation study will be required. 3. There will be no parking on the street for lots adjacent to the narrow paving for the streets and cul-de-sacs. 4. Impact fees will be required.