Summit P1-CS 960530DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Summit at tke $~r~es. ~l Plat. to allow ~e developneat of a
55-10~ sitlgle-family residential sldtdi~tt ott 29.88 acres of
properly, located on the south side of Bethel Road, approximately
500' ~es: o~ Denton Tap Road, at the reques: o! Dowdey, Anderson
& Associates, Inc.
DRC DATE: May $0, ~ and 5une ~, ~9~
CONTACT: M~e Martin, E.L T., Assistant City E#gi~eer ($04-$~79)
COMMENT STATUS: ~PP~LIMINARY ~ ~
1. Provide a note that common areas to be maintained by Homeowners Association.
2. Indicate variance for deletion of alleys for Block B, Lots 1-25, 35-37, 44 & 45.
3. Provide sight visibility triangles at Armstrong and Bethel Road.
4. Provide metes and bounds description of median islands and a note "To be Maintained
by Homeowners Association".
5. Show and label all easements.
6. Show correct right-of-way for Bethel Road.
7. Sheet A-l, show correct street and visibility triangles at entrance.
8. During the actual plan review phase, there will be comments concerning the placement
of the water line in the various cul-de-sacs. There may need to be some looping of the
water line to eliminate the long services to the residential lots.
9. The various cul-de-sacs could pose a problem for fire trucks.
Landscaping Plans:
1. The Preliminary Entry Development East Entry Scheme 2 needs to show width of the
roadway coming off of Bethel Road.
2. The wrong street name is shown on the wall plans. The street should be Bethel Road,
not Bethel School Road.
These are informational comments and should have no bearing on the approval of the plat:
1. Some type of slope protection may be required in the bend of Grapevine Creek
adjacent to Lot 45, Block B and Lot 1X, Block A.
2. A floodplain reclamation study will be required.
3. There will be no parking on the street for lots adjacent to the narrow paving for the
streets and cul-de-sacs.
4. Impact fees will be required.