Loading...
Summit P1-CS 960502DEVELOPMENT REVIEW COMMI2 FEE ENGINEERING COMMENTS 70-1at single-farm'ly residential mbdirition on 29. S8 acres of lwopo~, laca~ on the south ~ of Bethtl Road, appmzimatdy $00' wtst of Denton Tap Road at the reqtte, lt of Dowd~y, Anderson and Atsac. DRC DATE: April 25, 1996 and May 2, 1996 CONTACT: M'ti~ Uartitn F,.I.T., ~ City I~ngineer 004-3679) COMMENT STATUS: ~m'r'r. '"''"TA,,.~, , nv, /FINAL ~ Landscaping Plans: The Preliminary Entry Development East Entry Scheme 2 shows the roadway coming off of Bethel Road to be 15 feet in width, however, the plat shows 21 feet in width. These should be consistent. Also, the exit should be a minimum of 25 feet in width. These are infonnational comments and should have no bearing on the approval of the plat: 1. Some type of slope protection may be required in the bend of Grapevine Creek adjacent to lot 45, Block B and Lot IX, Block A. 2. A floodplain reclamation study will be required. 3. There will be no parking on the street for lots adjacent to the narrow paving for the streets and cul-de-sacs. 4. Impact fees will be required.