Loading...
Stoneleigh P2-CS010319George Richmond Spring Valley Construction Company 10950 Alder Circle Dallas, Texas 75238-1353 RE: Stoneleigh @ Riverchase II Dear Mr. Richmond: In accordance with your request, inspection service was provided by the City of Coppell Engineering Departmem at the referenced location on Saturday, March 17, 2001. The overtime rate including salary and benefits is $30.00 per hour. Two hours were charged to your company on that date. Please send a copy of this letter along with your check for $60.00, payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attemion: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincerely, A Cot~truction Inspector cc: Finance Departmem Rhonda Brothers, Engineering Secretary 255 PARKWAY 'k P.O.BOX 478 air COPPr'LL TX 75019 ~k TE~_ 972/462 0022 'k FAX 972/304 3673 March 14, 2001 Larry Davis Duc to thc previous weather delays we arc requesting thc permission for the City of Coppell to Inspect our Paving "E" (Aprox. 450 cu yards) on March 16th in the afternoon. Also we would like to request the permission for an A.M. concrete pour on ]~ Saturday 17th. Should you have any questions please call our office at 972-745-6650. Thank you, George Richmond