Stoneleigh P2-CS010319George Richmond
Spring Valley Construction Company
10950 Alder Circle
Dallas, Texas 75238-1353
RE: Stoneleigh @ Riverchase II
Dear Mr. Richmond:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Departmem at the referenced location on Saturday, March 17, 2001. The overtime
rate including salary and benefits is $30.00 per hour. Two hours were charged to your company
on that date.
Please send a copy of this letter along with your check for $60.00, payable to the City of Coppell
to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attemion: Jennifer Armstrong, Finance Director
If you should have any questions, please contact me at (972) 304-3679.
Sincerely, A
Cot~truction Inspector
cc: Finance Departmem
Rhonda Brothers, Engineering Secretary
255 PARKWAY 'k P.O.BOX 478 air COPPr'LL TX 75019 ~k TE~_ 972/462 0022 'k FAX 972/304 3673
March 14, 2001
Larry Davis
Duc to thc previous weather delays we arc requesting thc permission for the City
of Coppell to Inspect our Paving "E" (Aprox. 450 cu yards) on March 16th in the
afternoon. Also we would like to request the permission for an A.M. concrete pour on
]~ Saturday 17th. Should you have any questions please call our office at 972-745-6650.
Thank you,
George Richmond