Loading...
Stoneleigh P2-CS001226December 26, 2000 George Richmond Spring Valley Const. Co. 10950 Alder Circle Dallas, Texas 75238-1353 RE: Stoneleigh At Riverchase II Dear Mr. Richmond: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, December 23, 2000. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a copy of this letter along with your check for $120.00, payable to the CiD' of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincerely~,~ ,.,. Lanny Allison Construction Inspector cc: Finance Department Debi Ingram, Engineering Secretary 255 PARKWAY 'Jr P.O.BOX 478 '~' COPPELL TX 75OI9 '/' TEL 972/462 0022 '~' FAX 9721304 3673 D~o E1 O0 10: 18a SP~-ZNG VRLLEY CONSTR CO 87~ 7~S 0708 Spring V~lley Construction Company l~cember 21, 2000 Mr. Lanny Allison Due to the previous weather de!ays we are requesting the permission for ,Mr. Allison to work 4 hours at the Greenbrier at Riverchase Job # 00055 to inspect a concrete paving pour on paving A. On Saturday, December 23,2000. Should you have any questions please call our office at 972-745-6650. Thank you, 10gsoAIcler Circle. Oallms. Texas 7S2.38-1353 · 214/34G.cjs00 · Fax 214/340.9~ 00 -.q