Stoneleigh P2-CS 990621 RO. Box 478
Coppell. Texas 75019
972-462-OO22
The City With A Beautiful Future
P.O. BOX 478
COPPELL, TEXAS 75019 FILE June 21, 1999
Michael Daniel, P.E.
Nathan D. Maier Consulting Engineers, Inc.
Two Northpark / 8080 Park Lane Suite 600
Dallas, Texas 75231
RE: Stoneleigh at Riverchase II
Fee Assessment Letter
Park Development Zone: Zone 2
REVISED
Dear Mr. Daniel:
Enclosed is a revised copy of the City of Coppell Development Fee Assessment table,
along with a copy of the Development Fee calculations for the referenced development.
The reason for the revision is that a portion of the water impact fee for the irrigation
meters was omitted in the original fee assessment.
Please make payment to the City of Coppell in the amount of $661,261.00 and forward
to the Finance Department along with a copy of the Fee Assessment table. This amount is
a portion of the assessed fees that need to be paid prior to Council approval. Please refer
to the attached table for additional fees. Also provide a copy of the Engineer's estimate or
contract to our office so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
Michael A. Martin, P.E.
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE WORKSHEET
PROJECT: Stoneleigh at Riverchase H
DATE: 6/21/99
Water Impact Fee:
Domestic Meter(s): 2 - 4 inch = 50 ESU's
Irrigation Meter(s): 2 - 2 inch -- 16 ESU's
0 = 0 ESU's
Fireline Meter(s): 2 - 8 inch = 2.5 ESU's
Total #: 68.5 ESU's @ $450.00 ea. $30,825.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea. $200.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic/Fire Water Meter Fee:
Total #: 2 8"x4" Combo Meter(s) @ $7,035.00 $14,070.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $192.15 $384.30
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic/Fire Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea. $70.00
(100% due prior to issuance of water meters)
Irrigation Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 50 @ $450.00 ea. $22,500.00
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (AH developments):
Total #: 2 Lots @ $50.00 ea. $100.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone: Zone 2
0 Single-family @ $1,285.00 per lot $0.00
322 Multi-family @ $1,285.00 per unit $413,770.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $194,166.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Data Not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Data not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Data not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
DEVELOPMENT FEE TABLE
Project: Stoneleigh at Riverchase H
Date: 6/21/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $30,825.00 $30,825.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic/Fireline) $14,070.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation) $384.30
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic/Fireline) $70.00
(100% due at Issuance of Water Meter)
Irrigation Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $22,500.00 $22,500.00
(100 % due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $413,770.00 $413,770.00
(100% due prior to Council Approval)
Roadway Impact Fee $194,166.00 $194,166.00
(100% due prior to Council Approval)
Street Light Fee Data Not Available
(100% due prior to Acceptance of Project
Street Sign Fee Data not Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Data not Available
TOTAL $676,245.30
TOTAL AMOUNT DUE PRIOR TO CouNCIL APPROVAL $661,261.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Stoneleigh at Riverchase H
DATE: 6/21/99
ROADWAY IMPACT FEE:
Service Area * 7
Category ** Residential
Land Use ** Multi-Family
Development Units ** 322
Vehicle Miles per Development Unit ** 2.01
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $194,166.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Sthdy)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.