Loading...
ST9801-CS 991216Project: Date: Time: I. II. HI. CITY OF COPPELL, TEXAS PROGRESS MEETING AGENDA Coppell Road Paving, Drainage and Water Line Installation December 16, 1999 9:00 AM PROJECT ISSUES A. Utility Confiicts/Relocations (TXU Electric/TXU Gas/Paragon Cable/GTE) B. Waterline Construction C. Box Culvert Construction D. Storm Drain Construction E. Paving Issues F. Communications with Property Owners/Residents G. Submittals SCHEDULE ISSUES A. Traffic Control Plan B. Work Expected in Next Month? LIPCOMING CALENDAR EVENTS anuary 6,''·9:00 t ' B. 1 Sent Dy: FREESE & NZCHOLS 214~1~2565 12/21/99 9),~I, AM Job 346 Page 2/3 FREESE ' NICHOLS Meetina Minutes ,%.'lllltln W. Fr~:cs,.', Marvin C. Nidlols. I'.E I L~O0 I H96. I Project: Subject: Recorded by: Date: Location: Attcndces: Coppeil Road hnprovernents Construction Meeting Keyin Young t~~ December 16, 1999 Coppell City Hall Larry .Davis, Kent Collins, Mike Martin, Robert 'Weber, Gary Pryor, Kevin Young The following ix our under.~tanding of the subjec. t matter covered during the subject meeting. If this differs from your understanding, please notify us within five working days. Tirne m~d schedule coordination between contractor and City will be required in the testing of utility lines. No utility conflicts m'e apparent, with the exception of the two utility poles in the vicinity of the Brazos electrical station. The 96" RCP is currently under construction. The rmtred end is being installed. One inlet has been poured, but no others will be added at this time. It is advised that any inlets in progress should have safety I~:ncing and barricades. The City has not made a decision on the subgrade design. Council has granted permission to close the east/west portion of the roadway for eight weeks beginning in January. It is advised that we utilize this time for total construction of this portion of the road. *The City would like to see a copy of all correspondence with citizens concerning construction issues. b'REESE AND NICHOI.S · 1701 N. MARKEr STREET, SUITE 500 · DALLAS. TEXAS 75202-2001 'FEI,F. PHON.E: 2 14-920-2500, FAX: 214.920-2565 · FORM DATE: 11111/99 JSent by: FREESE & NICHOLS 214~-1q2565 12/21/99 9)~AM Job 346 Page 3/3 Meeting Minutes Coppell Road Reconstruction December 2 !, 1999 Page 2 10. 11. 12. The City requires 10 days notice for GTE and Mansions notification. F!yers and channel ! 9 will be used to inform the public. The school district has been contacted concerning the road closure. *A detour plan is needed from Ed Bell showing signage and b~m-icadcs for detouring the closure. especially advance signing. *Any signage placed in the TxDOT ROW will need their approval, *In regards to the box culvert construction, it will be necessary to schedule a meeting with Ed Bell, the City, FNI, and Coppell Construction to determine and agree upon a work phtn. Work anticipated in the next month includes the waterline, and storm drainage and paving in the east/west portion. *Action Item - END- FREESE AND NICHOLS · IT01 N. MARKET STREFT. SUITE 500 · DALLAS. 'IIiXAS 75202-20¢11 'FELEPi!ONE: 2 14-920-2501} · FAX: 214-920 2565 1' FORM DATE: I111 1/99