Stoneleigh P2-CS 990309 · rr r Coppell. Texas 75019 ~ ~ The City With A Beautiful Future~C 0 PP ELL 1P 0 I BOx 478TE~S75019 F'LE 97::)'46~)'00P2 March 9, 1999 Michael Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. Two Northpark / 8080 Park Lane Suite 600 Dallas, Texas 75231 Fee Assessment Letter Park Development Zone: Zone 2 Dear Mr. Daniel: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the mount of $657,661.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This mount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Stoneleigh at Riverchase H Date: 3/9/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $27,225.00 $27,225.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) ' Water Meter Fee (Domestic/Fireline) $14,070.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation) $384.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic/Fireline) $70.00 (100% due at Issuance of Water Meter) Irrigation Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $22,500.00 $22,500.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $413,770.00 $413,770.00 (100% due prior to Council Approval) Roadway Impact Fee $194,166.00 $194,166.00 (100% due prior to Council Approval) Street Light Fee Data Not Available (100% due prior to Acceptance of Project Street Sign Fee Data not Available (100% due prior to Acceptance of Project Construction Inspection Fee Data not Available TOTAL $672,645.30 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $657,661.00 DEVELOPMENT FEE WORKSHEET PROJECT: Stoneleigh at Riverchase H DATE: 3/9/99 Water Impact Fee: Domestic Meter(s): 2 - 4 inch = 50 ESU's Irrigation Meter(s): 2 - 2 inch = 8 ESU's 0 = 0 ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 60.5 ESU's @ $450.00 ea. $27,225.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 0: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic/Fire Water Meter Fee: Total 0: 2 8"x4" Combo Meter(s) @ $7,035.00 $14,070.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation Water Meter Fee: Total 0: 2 Irrigation Meter(s) @ $192.15 $384.30 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic/Fire Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Irrigation Meter Deposit Fee: Total 0: 2 Meter(s) ~ $30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 50 @ $450.00 ea. $22,500.00 Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: Zone 2 0 Single-family ~ $1,285.00 per lot $0.00 322 Multi-family @ $1,285.00 per unit $413,770.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $194,166.0.0 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Data Not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Data not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Data not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Stoneleigh at Rivet'chase H DATE: 3/9/99 ROADWAY IMPACT IService Area * I 7 ICategory ** , Residential Land Use ** Multi-Family Development Units ** 322 Vehicle Miles per Development Unit ** 2.01 Fee per Vehicle Mile *** $300 , Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $194,166.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.