Loading...
ST9801-CS 991118FAX (214) 352-3201 ~-% .~ TELEPHONE (214) 358~581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354~)787 DALLAS, TEXAS 75220 November 18, 1999 Mr. Kevin C. Young, E.I.T. Freese and Nichols, Inc. 1701 N. Market, Suite 500, LB 51 Dallas, Texas 75201 Re: Coppell Road Reconstruction SH 121 to Sandy Lake Road Dear Mr. Young: In accordance with your request for a cost break down regarding the additional cost required to construct the multiple box culvert in two stages, the following information is provided for your review: Stage 1 Dirtwork for two lane detour Culvert for detour Provide and set CTB w/end protection (300 LF) HMAC for demur surface (350 TNS) Remove demur Striping for demurs Shoring at box end and between box and road (2180 SF) Drainage through shoring Extra handling of dirt (2600 CY) $20,120.00 $1,000.00 $10,800.00 $26,500.00 $7,000.00 $1,500.00 $54,300.00 $2,180.00 $15,800.00 Stage 2 Dirtwork for detour Reset CTB w/end protection Remove CTB w/end protection HMAC for detour surface (240 TNS) Remove detour Additional traffic control Striping for detours Labor/Equipment increase for decreased production $10,500.00 $2,500.00 $3,500.00 $18,800.00 $4,000.00 $12,000.00 $1,500.00 $75,200.00 Total $267,200.00 If you have any questions regarding this information, don't hesitate to contact our office. ~rely, / ~..i.o ,c.~~Company Robert D. Weber Project Engineer xc: Mr. Kent Collins, P.E., Engineering and Public Works, City of Coppell 255 Parkway Blvd., Coppell, Texas 75019-4409 AN EQUAL OPPORTUNITY EMPLOYER