Loading...
Summer Place-CS 860922DI~AL A~ ASSOCIATES ~nc TO: Randy Fleming Ginn, Inc. DATE: 9-22-86 16135 Preston Rd., #106 JOB NO' 22-D-86 Dallas, Tx. 75248 REPORT NO: 86-1044 RE: Lime check on material PROJECT- Summer Place DATE PERFORMED- 9-11-86 LOCATION: Coppe11 GENERAL REPORT REMARKS: As requested by Randy Fleming with Ginn, Inc. our technician was on project to perform lime checks on base material under the pavement. The area in question is towards the west side of the property at the curve in Alley way A: A 2" utility line is backfilled in this area. A visual observation was made in the area which disclosed that a layer of fill material had been placed on top of the lime treated material at the south end of the ditch. Samples of both materials were obtained and returned to ourlaboratory for Atterburg Limit Tests. Results are recorded on Report #86=1046. Both materials are below 12 P.I. The sandy clay material does not appear to be the full length of ditch backfill. TECHNICIAN: T. Martin TECHNICIAN TIME: 3 hrs. MILEAGE: 53 miles cc: Ned Tankersley-Southwestern Contracting Jim Jenne - Jim Jenne Homes Mike Cummings-Cumming & Pewitt D. Kight - Director Construction Services DUVAL ~.~ ASSOCIATES ~.~c CLIENT' Mr. Randy Fleming DATE: 9-22-86 Ginn, Inc. JOB NO.'22-D-86 16135 Preston R.d, #106 Dallas, Texas 75248 REPORT NO.-86-1044A SUMMER PLACE Coppe11, Texas FIELD DENSITY-REPORT CONTRACTOR' Southwestern Contracting REMARKS' As requested by Randy Fleming with Ginn, Inc. , technician was on project to perform density tests on pavement base materials. DENSITY TEST RESULTS DATE TESTED- 9-11-86 MOISTURE CONTENT UNIT DRY WEIGHT PERCENT LBS./CU.FT. 86-1045 SP-1 Alley B-Electric cut out in street 13.8 14.0 107.2 114.0 94.0 Test as noted indicates slightly low moisture content with adequate compaction- recommend acceptnace. TECHNICIAN: T. Martin TECHNICIAN TIME: ~.Kight CC: Southwestern Contracting Director Construction Services Jim Jenne Homes Cummings & Pewitt