ST9801-CS 991104 (2)C' Project: Date: Time: I. CITY OF COPPELL, TEXAS PROGRESS MEETING AGENDA Coppell Road Paving, Drainage and Water Line Installation November 4, 1999 9:00 AM PROJECT ISSUES A. Utility Conflicts/Relocations (TXU Electric/TXlJ Gas/Paragon Cable/GTE) B. Tree Removal and Fence Relocation C. Waterline Construction D. Box Culvert Construction E. Paving Issues F. Communications with Property Owners/Residents G. Batch Plant Site, Material Spoil Site SCHEDULE ISSUES A. Traffic Control Plan - Closures Need 30-day Advance Notice B. Work Expected in Next Month? LIPCOMING CALENDAR EVENTS A. Next Progress Meeting (Tentative): November 18, 9:00 am B. Thanksgiving Holidays: November 25th & 26th .Sent By: FREESE & NZCHOLS 2149202565 11/08/99 10: 48AM c- "'I, Job 492 Page 2/3 FI~EESE .- NICHOLS Meeting Minutes Smum W. Frcesc. P.E. 191)0 Malvin C. Nichols. P.F'.'. I ,~96- Project: Sulkjeer: Recorded by: Date: Coppeil Road hnprovemcnts Prqiect #ST98-0 1 Construction Meeting KevinYoung//~:(~ November 4, 1999 l ,oc at i o n: At-ten~lees: :., :, . City of Coppell Town. Hall L,'u'ry Davis, Kent Collins, Mike Martin, Robert Weber, Gary Pryor, Wiley Beesley, Keyin Young The.lblh~wing is our Understandi.ng of the subject matter covered during the subject tneeting. li this differs from your understanding, please notify us within five working days. Project 1. , issues: *Ed Bell Construction needs poles removed by TXl..J on the north side of the east/west portion of Coppell Road. There is a new TXU line running east/west on the north side of the Callejo property that crosses Coppeil Road. This line is approximately 36" deep and dives deeper beneath the roadway. *The 10" existing waterline was struck in efforts to install the new 12" waterline, across fi'om the Mansions entrance. Field adjustments were made to realign the proposed main, and City crows supplied a clamp to make repairs to the old line still in service. The City asics that Ed Bell lirafish their maintenance crew with a replacement clamp and keep an emergency supl>ly li.n' such unforsccn instances, *Tree removal is in progress. Stump rclliova.1 is scheduled to start on the east/west portion on Monday, 11-8. Fence relocation will also begin, soon. Relocation shoukt take approximately 3 days, per E.B .C. Ed Bell should contact Callejo to discuss the Fence relocation. If there is negative response to the issue, E.B. shall call FNI, and further action will be dctcrmined. *There is a tree ramoval quantity discrepancy at the Coppeli Road bend. FNI will invesljgate this issue. The Hwy 121 watcrlinc connection has not been made. Once this occurs, wmerline crossings will FI{EIiSE AND NICFIO[~ · 12~,.I-I W. MOCKINGBIRD !.,ANF,, SUITE 23().-E ® DAI,I./\S, TEXA.~ 7524 TEI.,EH. IONE: 2 I,:1-921)-2500 · FAX: 2 I~i11~20-2565 · FOR.M DATE: 9!3/Y7 ,Sent by: FREESE & NICHOLS 2149202565 , (- 11/08/99 10:48AM Job 492 Page 3/3 Metling Minutes Coppell Road Improvements SI'98-01 October 2 I, 1999 Page 2 I1. bc installed. The waterline is the top priority, per Mr. Pryor. The traffic control situation associated with the waterl ine construction has ~en handled well. There have been no cilizen complaints. E~p~ ~?~ ,'l/t b7 (~7~ d~ (~ *,,['/,~ c~'~y ~,,?a r~lc,'~/o/ *Ed Bell must contact TxDot prior to construction in their ROW. Ed Bell needs to have the Tx pcrmit on hand during this construction. There is an unex~cted RCP crossing Cop~ll Road at station 33+07. The City will discuss'rifts issue with FNI to determine how to deal with this pipe dm'ing paving operations,. ' Traffic and phasing phm subn~tted on l 1-4. The council date tbr the review and apprdwfi all'this plan is in December. FNI and the City will review this plan in the next week. C0ppcll Construction is ready to ~gin culvert construction as soon as possible. The next council meeting to consider road closure is December 14, 1999. Ed Bell has talked to the owner of the trailer park property regarding the batch phmt k.~cation and fill site. The City expressed concern over t.~s area ~ing used ~ks a fill site clue to the concrete and voids sti 1l present in the ground. The site will have to be cle~med prior to use. The City w ill al low the concrete to be ground to less than 6" in diameter and left cm site. 'l'he sanitary sewer presem on the trailer park will have to be addressed. Tt~e owner will have to address issues concerning ~rec proteclion prior to land use. Overhead lines are supposed to be dead on the site. 'l"here seems to ~ mote sandy soils in this aea than originally anticipated. The current subgrade design Ibr Coppell Road is aconcern to the City. FN! will work with Tetra Mar and Stantcch determine if any changes to th~ design m'e required. Work expedtcd in the next two weeks includes the trec removal, waterline, and possibly the 96" RCPj * Action ltcnis - END - I'~EI"LSE AND NI(.'H()I_S · 13,11 W. MCK'KINGBIRD I.ANI2, SOITE 230-E $ DALLAS. T|:iX:\S 752.17.4922 TEI,EPI ION E: 214-920-25(}0 ® FAX: 214 ,.921'). 2565 · FYJR M DATE: 9/3/97