Town Center L2B1-LR 960228 Hooper Engineering Laboratories, Inc. Construction Materials Testing CORING & COMPRESSION TESTS OF HARDENED CONCRETE CLIENT: North Texas Contracting, Inc. DATE: 28 February 1996 PROJECT: Wendy's Town Center, Coppell, TX SAMPLES: Eight 4" dia. cores were taken by a representative of Hooper Engineering Laboratories, Inc. on 2/28/96. DATE OF CONCRETE PLACEMENT: 2/13!96 DATE TESTED: 2/29/96 (1 C, 1D), 3/12/96 (remainder) METHOD OF TEST: ASTM C42-90 DIRECTION OF LOAD: Perpendicular to direction of concrete placement MOISTURE CONDITION AT TIME OF TEST: 16 hours moist cure (1 C, 1D), 40 hours moist cure (remainder) CORE CORE LENGTH AREA TOTAL CORRECTED NO. ORIGINAL DRESSED & CAPPED SQ. IN. LOAD-LBS. COMPRESSIVE STRENGTH psi 1C 6.6" 6.64" 12.566 36,500 2830 2C 6.3" 6.52" 12.566 3C 6.8" 6.96" 12.566 4C 6.7" 6.79" 12.566 1D 7.2" 7.61" 12.566 45,000 3550 2D 6.2" 6.57" 12.566 3D 6.8" 7.29" 12.566 4D 5.4" 5.70" 12.566 LOCATIONS OF CORES: Spine Road 1C, 2C, 3C, 4C - Southbound lane @ Station 15 + 00 (Reference cylinders #84-#87) 1D, 2D, 3D, 4D - Southbound lane ~ Station 20 + 50 (Reference cylinders #72-#75) TECHNICIAN: MAC (8:00am-1:30pm) DISTRIBUTION: (1) North Texas Contracting, Inc. (2) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing CORING & COMPRESSION TESTS OF HARDENED CONCRETE CLIENT: North Texas Contracting, Inc. DATE: 28 February 1996 PROJECT: Wendy's Town Center, Coppell, TX SAMPLES: Eight 4" dia. cores were taken by a representative of Hooper Engineering Laboratories, Inc. on 2/28/96. DATE OF CONCRETE PLACEMENT: 2/9/96 DATE TESTED: 2/29/96 (lA, lB), 3/8/96 (remainder) METHOD OF TEST: ASTM C42-90 DIRECTION OF LOAD: Perpendicular to direction of concrete placement MOISTURE CONDITION AT TIME OF TEST: 16 hours moist cure (lA, 1B), 40 + hours moist cure (remainder) CORE CORE LENGTH AREA TOTAL CORRECTED NO. ORIGINAL DRESSED & CAPPED SQ. IN. LOAD-LBS. COMPRESSIVE STRENGTH psi lA 6.5" 6.65" 12.566 45,500 3520 2A 6.1" 6.23" 12.566 3A 7.1" 7.20" 12.566 4A 6.5" 6.74" 12.566 1B 6.2" 6.05" 12.566 38,500 2940 2B 6.6" 6.70" 12.566 3B 6.8" 7.09" 12.566 4B 7.7" 7.76" 12.566 LOCATIONS OF CORES: Spine Road lA, 2A, 3A, 4A - Northbound lane ~ Station 16 + 25 (Reference cylinders #64-#67) 1 B, 2B, 3B, 4B - Northbound lane @ Station 15 + 75 (Reference cylinders #68-#71) TECHNICIAN: MAC (8:00am-1:30pm) DISTRIBUTION: (1) North Texas Contracting, Inc. (2) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing CORING & COMPRESSION TESTS OF HARDENED CONCRETE CLIENT: North Texas Contracting, Inc. DATE: 28 February 1996 PROJECT: Wendy's Town Center, Coppell, TX SAMPLES: Eight 4" dia. cores were taken by a representative of Hooper Engineering Laboratories, Inc. on 2/28/96. DATE OF CONCRETE PLACEMENT: 2/9/96 DATE TESTED: 2/29/96 (1 A, 1B), 3/8/96 (remainder) METHOD OF TEST: ASTM C42-90 DIRECTION OF LOAD: Perpendicular to direction of concrete placement MOISTURE CONDITION AT TIME OF TEST: 16 hours moist cure (lA, 1B), 40 + hours moist cure (remainder) CORE CORE LENGTH AREA TOTAL CORRECTED NO. ORIGINAL DRESSED & CAPPED SQ. IN. LOAD-LBS. COMPRESSIVE STRENGTH psi lA 6.5" 6.65" 12.566 45,500 3520 2A 6.1" 6.23" 12.566 46,500 3570 3A 7.1" 7.20" 12.566 47,400 3710 4A 6.5" 6.74" 12.566 48,700 3780 Average - 3690 1B 6.2" 6.05" 12.566 38,500 2940 2B 6.6" 6.70" 12.566 42,100 3260 3B 6.8" 7.09" 12.566 39,100 3060 4B 7.7" 7.76" 12.566 41,300 3270 Average - 3200 LOCATIONS OF CORES: Spine Road lA, 2A, 3A, 4A - Northbound lane @ Station 16+ 25 (Reference cylinders #64-#67) lB, 2B, 3B, 4B - Northbound lane @ Station 15+75 (Reference cylinders #68-#71) REMARKS: ACI 318, 5.6.4.4 states that concrete is structurally adequate if core strengths are at least 85 % of the design strength. Reinforcing in middle of core 2B. j//~ /~ TECHNICIAN: MAC (8:00am-1:30pm) DISTRIBUTION: (1) North Texas Contracting, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-$141~ Hooper Engineering Laboratories, Inc. Construction Materials Testing CORING & COMPRESSION TESTS OF HARDENED CONCRETE CLIENT: North Texas Contracting, Inc. DATE: 28 February 1996 PROJECT: Wendy's Town Center, Coppell, TX SAMPLES: Eight 4" dia. cores were taken by a representative of Hooper Engineering Laboratories, Inc. on 2/28196. DATE OF CONCRETE PLACEMENT: 2/13/96 DATE TESTED: 2/29i96 (1 C, i D), 3/12/96 (remainder) METHOD OF TEST: ASTM C42-90 DIRECTION OF LOAD: Perpendicular to direction of concrete placement MOISTURE CONDITION AT TIME OF TEST: 1 6 hours moist cure (1 C, 1D), 40 hours moist cure (remainder) CORE CORE LENGTH AREA TOTAL CORRECTED NO. ORIGINAL DRESSED & CAPPED SQ. IN. LOAD-LBS. COMPRESSIVE STRENGTH psi 1C 6.6" 6.64" 12.566 36,500 2830 2C 6.3" 6.52" 12.566 43,200 3340 3C 6.8" 6.96" 12.566 42,600 3320 4C 6.7" 6.79" 12.566 40,500 3150 Average of 3 - 3270 1D 7.2" 7.61" 12.566 45,000 3550 2D 6.2" 6.57" 12.566 48,600 3760 3D 6.8" 7.29" 12.566 44,500 3490 4D 5.4" 5.70" 1 2.566 48,700 3690 Average of 3 - 3650 LOCATIONS OF CORES: Spine Road 1 C, 2C, 3C, 4C - Southbound lane @ Station 15 + 00 (Reference cylinders #84-#87) 1 D, 2D, 3D, 4D - Southbound lane @ Station 20 + 50 (Reference cylinders #72-#75) REMARKS: ACI 318, 5.6.4.4 states that concrete is structurally adequate if core strengths are at least 85% of the design strength. TECHNICIAN: MAC (8:00am-l:30pm) ~ ~'~~' DISTRIBUTION: (1) North Texas Contracting, Inc. (2) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148