Loading...
Town Center L2B1-LR 960220 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: North Texas Contracting, Inc. DATE: 20 February 1996 PROJECT: Wendy's Towne Center, Coppell, TX SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, 18' east & 10' north from tip of center section curb of Towne Center Blvd. at intersection with Towne Center Drive LOCATION OF POUR SET 2: Paving, 54' east & 10' north from tip of center section curb of Towne Center Blvd. at intersection with towne Center Drive SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 573 332 C~ment Ticket No. 7018454 6029187 Flyash Time Batched 10:05am 11:06am Sand Time Sampled 11:05am 12:00 N in. Concrete Temp. IASTM C1064) 72°F 74°F 1.0 in. Air Content (ASTM C231) 5.2% 5.0% Water Unit Weight {ASTM C138) Admix //1 Admix //2 AEA FLEXUR,4L STRENGTH TESTS (AASHO T97) (Standard 6 inch x 6 inch x 20 inch beam) Beam Slump Age Test Total Load Flexural Required Number Inches Days Date Pounds Strength 7-Day (ASTM C143) psi Strength 94 7.50 7 02/27/96 6,450 535 95 7.50 28 03/19/96 96 7.50 28 03/19/96 28-Day Average 650 97 5.50 7 02/27/96 7,800 650 98 5.50 28 03/19/96 99 5.50 28 03/19/96 28-Day Average 650 TECHNICIAN: JWJ (10:30am-l:00pm) DISTRIBUTION: (1) North Texas Contracting, Inc. (1) City of Coppell, Larry Davis 2870 Walnut Hill Larte Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148