Loading...
Town Center L2B1-LR 951212 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: North Texas Contracting, Inc. DATE: 1 2 December 1995 PROJECT: Wendy's Towne Center, Coppell, TX MATERIAL DESCRIPTION: 1) On-Site Fill - Light Brown & Orange Sandy Clay ASTM D 698 STANDARD PROCTOR: 1) 106.0 pcf @ 15.0% MoisTure MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Backfill Over Sanitary Sewer Line A 31) approx. Station 14+80 1 Fin. Sub. 14.4 96.1 90.6 90.- -2% to ~-4% Of Optimum 32) approx. Station 16~-45 1 Fin. Sub. 15.5 106.6 100.5 95-. -2% to +4% Of Optimum TECHNICIAN: CDJ DISTRIBUTION: (2) North Texas Contracting, Inc. (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: North Texas Contracting, Inc. DATE: 12 December 1995 PROJECT: Wendy's Town Center, Coppell, TX SUPPLIER: Lattimore LOCATION OF POUR SET 1: Rip rap, southbound left turn lane, nose of median LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 452 Cement Ticket No. 6026479 Flyash Time Batched 1:29pm Sand Time Sampled 2:1 Opm in. Concrete Temp. {ASTM C1064) 71 °F 1.0 in. Air Content (ASTM C231) 4.3% Water Unit Weight (ASTM C138) Admix //1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39! (Standard 6 inch x 12 inch cylinder) Cylinder' Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143] psi Strength 12 4.25 7 12/19/95 113,000 4000 13 4.25 7 12/19/95 117,400 4150 14 4.25 28 01/09/96 1~5,600 5150 15 4.25 28 01/09/96 150,100 5310 28-Day Average 5230 3000 TECHNICIAN: MAC (12:30pm-3:00pm) DISTRIBUTION: (2) North Texas Contracting, Inc. (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351~5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: North Texas Contracting, Inc. DATE: 1 2 December 1 995 PROJECT: Wendy's Town Center, Coppell, TX SUPPLIER: Lattimore LOCATION OF POUR SET 1: Rip rap, southbound left turn lane, nose of median LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 452 Cement Ticket No. 6026479 Flyash Time Batched 1:29pm Sand Time Sampled 2:10pm in. Concrete Temp. [ASTM C1064) 71 °F 1.0 in. Air Content {ASTM C231) 4.3% Water Unit Weight [ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39! (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 12 4.25 7 12/19/95 113,000 4000 13 4.25 7 12/19/95 117,400 4150 1 4 4.25 28 01/09/96 15 4.25 28 01/09/96 28-Day Average 3000 TECHNICIAN: MAC (12:30pm-3:0Opm) DISTRIBUTION: (2) North Texas Contracting, Inc. (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148