Town Center L2B1-CS 950630 P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
June 30, 1995
Ms. Terri Jones, P.E.
Dowdey, Anderson & Associates, Inc.
16250 Dallas Parkway Suite 100
Dallas, Texas 75248
RE: First Construction Review for Wendy's Town Center Lot 2, Blk. 1
Dear Ms. Jones:
The City of Coppell has received and reviewed the referenced plans and has the following comments
to offer:
1. On the site plan, show the dimensions for the proposed deceleration lane. Also show the
sizes for the internal directional signs and markings.
2. Provide a final plat with the next set of review plans.
3. On the water and sanitary sewer plan, show the existing valve and air relief on the existing
water main. Also, provide the water service of the mainline instead of the fireline, show
the 30" water line and provide an easement for the meter and double check device.
4. Look at relocating the proposed 8" sanitary sewer line to the adjacent R.O.W. on Denton
Tap Rd.
5. Install a cleanout for the 4" sanitary sewer service.
6. Contact Dennis Slayton, Parks Superintendent, for the sprinkler and landscape relocation,
irrigation tap and meter location at 304-3551.
7. On the paving and grading plan, show the 5 foot sidewalk and show pavement markers and
signage for the proposed deceleration lane.
8. Provide a barricade plan for Denton Tap Rd.
9. On the overall drainage area map, provide hydraulic calculations for Wendy's and Overton
Bank.
10. On the dimension control plan, provide driveway curb radii, width of driveway
ingress/egress points and deceleration lane, left trun lane dimensions. Also, see comments
faxed to Terri Jones dated 6/14/95 regarding the right only driveway.
There are various other minor comments throughout the plans. Once these comments have been
addressed, the revised set of plans should be resubmitted to the City for review. If you should have
any questions concerning these comments, please contact me at 304-3682.
Sincerely,
Atul Patel, E.I.T.
Graduate Engineer