Loading...
Town Center L2B1-CS 950525 DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS DRC DATE: May 25, 1995 ~ June 1, 199s CONTACT: ~ Grilrm, P.E., ,4.o~irt,~t City Mam~ger/City Engineer (304-3679) Site Plan: 1. Various on-site directional signs will be required. You should coordinate the locations and types of signs with Ami Patel in the Engineering Department. 2. The 'exit only' drive should be more restrictive to prevent vehicles from entering at that location. Driveway should be consistent with streetscape plan. 3. Greenspace should be provided for the area between the dumpster site and the first diagonal parking space on the north side of the site. 4. Thc northern exit drive should be consistent with what is shown on the landscape plan. Preliminary Utility Plans: 1. An easement will be required for the proposed off-site sanitary sewer line.