Town Center L3B1-CS 960501E~(3TNEERTN(3 - fJTREET DTVT~TON
D&TB~
TO~
FROM:
MAy :1.; 3,996
L&rr~ Davis, Construction Tnspector
Walk Thru for Comerica Bank
A walk through was conducted at the above referenced location
today. The following deficiencies were identified:
Paver band south side insufficiently retained until
future development.
0~ 2. Repair curb south side south approach and seal.
0~ 3. Route and seal random crack north of south approach.
0~ 4.
6.
¢lt 7.
Route and seal inlet to curb and random crack extending
into ln. both sides.
Grind/bush along curb to drain.
Pull strip and seal TC Dr. at island.
Seal curb east side.