Loading...
Town Center L3B1-CS 950711The City With A Beautiful Future July 11, 1995 P.O, Box 478 Coppell, Texas 75019 214-462-0022 Bill Anderson Dowdy Anderson & Associates 16250 Dallas Parkway Suite 100 Dallas, Texas 75248 RE: Town Center Blk. 1 Lot 3 Comerica Bank Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list along with a copy of the Development Fee Calculations for the Town Center Blk. 1 Lot 3 Comerica Bank. Please make payment to the City of Coppell in the mount of $6,750.00 and forward it to Alan Johnson, Finance -Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffm, P.E. Asst. City Manager/City Engineer Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Park Development Coordinator Enclosures KG/ar CITY OF COPPELL DEVELOPMENT FEES Date: Project: July 11, 1995 Town Center Blk. 1 Lot 3 Comerica Bank TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Wastcwater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permi0 Water Meter Fee .(Domestic) $129.05 (100% due at Issuance of Water Meter) Water Meter Deposit $35.00 (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $129.05 (100% due at Issuance of Water Meters) Irrigation Meter Deposit $35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Aco~ptance of Project) ' available Park Fee (100% due prior to Council Approval) Street Excrow 0 0 (100% due prior to Council Approval) Construction Inspection Fee need submittal of 0 (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $7.328.10 $6,750.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. DATE TO: FROW RE: COPPELLENGINEERING MEMORANDUM ~u1¥ 5~ Mike Martin, E.I.T. Howard Pafford, Utilities Superintenden~A~O Development Fees for Town Center Blk. 1 Lot 3 Comerica Bank The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 1 1/2" 1 - Total 100% due prior to Council approval of the final plat. Domestic Meter/s = 5 ESU's 1 3/2" Irrigation Meter/s = 5 ESU's 10 ESU's @ $450.00 ea = $ 4,500.00 Domestic Meter/s = $ ESU's ESU's @ $450.00 ea = $ 2,250.00 100% due prior to Council approval of the final ~lat. Was~ewater Impa~t 1 - 1 1/2" Total 5 Water Tap Inspection Fee 2 Connections ~ $100.00_each~ = $ $00.00 ........ 100% due prior to issuance of.-buildingpermit for residential, (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 lO0% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 1 1/2"' Domestic Meters @ $ 129.05ea = $ 129.05 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 1/2" Irrigation Meter/s @ $ 129.05ea 100% due prior to issuance of water meter/s. = $ 129,05 Water Meter Deposit (Multi-Family or Non-Residential) 1 Meters @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation HeterDep~sit 1 Meters @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Comerica Bank ESCROW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Lot-3, Block I Town Center Addition (Comerica) 7/11/95 STREET ESCROW: Street Name(s) Denton Tap Road P4D/6 Street Type Cost per Foot $0.00 Length of Adjacent Frontage (Linear Feet) 213 Escrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $0.00 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** 2 Commercial Bank 0 2.11 Vehicle Miles per Development Unit ** Fee per Vehicle Mile $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $0.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.