Loading...
Town Center L1B1-LR 951228 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT; P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers, Inc. 1-City of Coppell PROJECT: Overton Bank & Trust Building-102,N.Denton Tap Road,Coppell,Tx. CONTRACTOR: Innovative Developers, Inc. ,Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete (Plant 1) 28 DAY DESIGN STRENGTH: 4,000 PSI LOCATION: Fire Lane- 40'S., 15'W. from N.E. JOB NO: 95-173-1 corner of slab. COMPRESSIVE STRENGTH TESTS (6"X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE SWL-5 12-28-95 1-04-96 7 day 4,740 --- SWL-6 12-28-95 1-25-96 28 day 4,960 --- SWL-7 12-28-96 1-25-96 28 day 4,640 --- SWL-8 12-28-96 Hold Hold I I ADMIXTURES 1% Calcium MEASURED SLUMP 7.0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT 1.0 AIR TEMPERATURE 50 °F TIME-BATCH --- CONCRETE TEMPERATURE 60 °F TIME-TEST 11: 55AM TRUCK NO. 191 SPECIMEN MADE BY: Maxim MIX DESIGN NO. Mix Number 732 TECHNICIAN TIME: 4.0 hrs. PAR~G.&-T-ESTING, INC. TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 1 54196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214)986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers, Inc. 1-City of Coppell PROJECT: Overton Bank & Trust Building-102,N.Denton Tap Road,Coppell,Tx. CONTRACTOR: Innovative Developers, Inc. ,Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete (Plant 1) 28 DAY DESIGN STRENGTH: 4,000 PSI LOCATION: Fire Lane-40'S., 15'W. from N.E. JOB NO: 95-173-1 corner of slab. COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE SWL-5 12-28-95 1-04-96 7 day 4,740 --- SWL-6 12-28-95 1-25-96 28 day SWL-7 12-28-96 1-25-96 28 day SWL-8 12-28-96 Hold Hold ADMIXTURES 1% Calcium MEASURED SLUMP 7.0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT 1.0 % AIR TEMPERATURE 50 ° F TIME-BATCH - - - CONCRETE TEMPERATURE 60 °F TIME-TEST 11: 55AM TRUCK NO. 191 SPECIMEN MADE BY: Maxim MIX DESIGN NO. Mix Number 732 TECHNICIAN TIME: 4.0 hrs. PARKLA~/NGINEERING & TESTING, INC. ......... TESTED IN ACCORDANCE WITH ASTM STANDARDS