Loading...
Town Center L1B1-LR 951211 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214)790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers, Inc. 1-City of Coppell PROJECT: Overton Bank & Trust Building-102,N.Denton Tap Road, Coppell, Texas. CONTRACTOR: Innovative Developers, Inc., Fort Worth, Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 4,000 PSI LOCATION: Parking Lot/Fire Lane: 125'E. ,30'S. JOB NO: 95-173-1 of S.E.Building Corner COI~PRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 691 12-11-95 12-15-95 4 day 3,325 C 5 Gallons of water 692 12-11-95 1-08-96 28 day 4,598 C were added after 693 12-11-95 1-08-96 28 day 4,775 C slump testing. Early break (4th day) cylinder was tested @ request of Gary Childers of IDI,Inc. ADMIXTURES Air MEASURED SLUMP 3.5 IN MAXIMUM AGGREGATE SIZE AIR CONTENT --- AIR TEMPERATURE 48 °F TIME-BATCH 9:16AM CONCRETE TEMPERATURE 44 °F TIME-TEST 10:15 AM TRUCK NO. 196 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 6 Sack Mix/Air TECHNICIAN TIME: 4.0 hrs. .'W.EERING & TESTING, INC. -f TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 FAX: (214) 790-5378 PRESIDENT CONCRETE TEST-STRENGTH REPORT Over:on Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers,Inc 1-City of Coppell PROJECT: Overton Bank & Trust Building-102,N.Denton Tap Road, Coppell, Texas. CONTRACTOR: Innovative Developers, Inc., Fort Worth, Tx. P.O.NO: CONCRETE SUPPLIER~ Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 4,000 PSI LOCATION: Parking Lot/Fire Lane: 125'E. ,30'S. JOB NO: 95-173-1 of S.E.Building Corner COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 691 12-11-95 12-15-95 ~ day 3,325 C 5 Gallons of water 692 12-11-95 1-08-96 28 day were added after 693 12-11-95 1-08-96 28 day slump testing. Early break (4th day) cylinder was tested @ request of Gary Childers of IDI,Inc. ADMIXTURES Air MEASURED SLUMP 3.5 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 48 °F TIME-BATCH 9: 16AM CONCRETE TEMPERATURE 44 °F TIME-TEST 10: 15 AM TRUCK NO. 196 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 6 Sack Mix/Air TECHNICIAN TIME: 4.0 hrs. PAR~RING & TESTING, INC. C D V T 0 TESTED IN ACCORDANCE WITH ASTM STANDARDS