Loading...
Town Center L1B1-LR 951205 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU. M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 1-Client CLIENT: Overton Bank & Trust COPIES TO: 1-Innovative P.O. Box 948 Developers, Inc. Coppell, Texas 75019 1-City of Coppell PROJECT: Overton Bank & Trust Bldg. -102,N.Denton Tap Road, Coppell, Texas. O0~RACTOR: Innovative Developers, Inc. ,Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete (Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Parking Lot: 58'S. ,46'E.of S.E.Bldg. JOB NO: 95-173-1 corner. COMPRESSIVE STRENGTH TESTS ($" X 12"' CYLINDER) CYLINDER DATE OF DATE AGE COI~PRESSIVE TYPE OF REHARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 685 12-05-95 12-12-95 7 day 3,042 C 5 gallons ofwater 686 12-05-95 1-02-96 28 day 3,961 C were added before 687 12-05-95 1-02-96 28 day 3,997 C slump testing. ADMIXTURES Air MEASURED SLUMP 4 . 0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- % AIR TEMPERATURE 58 o F TIME-BATCH 5: 30 AM CONCRETE TEMPERATURE 49 °F TIME-TEST 6:28 AM TRUCK NO. 116 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5 Sack Mix /Air TECHNICIAN TIME: 5.0 hrs. PARKLAND ENGINEERING & TESTING, INC. e~te~Yu, M. S., P.E. ~ C D V T 0 TESTED IN ACCORDANCE ~VITH ASTM STANDARDS '-' A '~ PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 1-Client CLIENT; Overton Bank & Trust COPIES TO; 1-Innovative P.O. Box 948 Developers, Inc. Coppell, Texas 75019 1-City of Coppell PROJgCT: Overton Bank & Trust Bldg. -102,N.Denton Tap Road, Coppell, Texas. CONTRACTOR.' Innovative Developers, Inc. ,Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete (Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Parking Lot: 58'S. ,46'E.of S.E.Bldg. JOB NO: 95-173-1 corner. COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 685 12-05-95 12-12-95 7 day 3,042 C 5gallons of water 686 12-05-95 1-02-96 28 day were added before 687 12-05-95 1-02-96 28 day slump testing. ADMIXTURES Air MEASURED SLUMP 4 · 0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- % AIR TEMPERATURE 58 OF TIME-BATCH 5: 30 AM CONCRETE TEMPERATURE 49 °F TIME-TEST 6:28 AM TRUCK NO. 116 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5 Sack Mix /Air TECHNICIAN TIME: 5.0 hrs. PARKLAND ENGI~_E_~RING & TESTING, INC. C D V T 0 TESTED IN ACCORDANCE WITH ASTM STANDARDS