Loading...
Town Center L1B1-LR 951130 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPSES TO: 1-Innvoative Coppell, Texas 75019 Developers, Inc. 1-City of Coppell PROJECT.' Overton Bank & Trust Bldg.-102,N.Denton 1-Frank Neal & Tap Road,Coppell, Tx. Associates, Inc. CONTRACTOR: Innovative Developers, Inc., Fort Worth,Tx. ?.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 4,000 PSI LOCATION: Slab-Vault Area ( S.E.Bldg. Corner) JOB NO: 95-173-1 (Set 1 / high strength concrete) -First 54 cubic yards only. COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF RF24AKKS Nlfl4BER PLACEHENT TESTED DAYS STRENGTH, PSI FAILURE 679 11-30-95 12-04-95 4 day 3,714 C Early breakcylinde: 680 11-30-95 12-28-95 28 day 4,457 C 681 11-30-95 12-28-95 28 day 4,549 C I ADMIXTURES --- MEASURED SLUMP 3~ IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 43 oF TIME-BATCH 6: 00 AM CONCRETE TEMPERATURE 40 °F TIME-TEST 6: 25 AM TRUCK NO. 191 SPECIMEN MADE BY.' Lab. MIX DESIGN NO. 6 Sack (4,000 PSI) TECHNICIAN TIME: 5.0 hrs. P~D ENGINEERING & TESTING, INC. TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 7501 5 PETER YU, M.S., P.E. TEL: (214)986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214)790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers, Inc. 1-City of Coppell PROJECT.' Overton Bank & Trust Bldg.-102,N.Denton 1-FrankNeal & Tap Road, Coppell,Tx. Associates, Inc. CONTRACTOR.. Innovative Developers, Inc., Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete (Plant 5) 28 DAY DESIGN STRENGTH.' 3,000 PSI LOCATION: Slab & Beam: Northeat Bldg. Corner JOB NO: 95-173-1 (Set 2/ Regular concrete) COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 682 11-30-95 12-07-95 7 day 3,431 C 5gallons of water 683 11-30-95 12-28-95 28 day 4,315 C were added after 684 11-30-95 12-28-95 28 day 4,244 C slump test. ADMIXTURES --- MEASURED SLUMP 3.0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 48 oF TIME-BATCH 7: 15 AM CONCRETE TEMPERATURE 42 oF TIME-TEST 8:15 AM TRUCK NO. 603 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5 Sack (3,000 PSI) TECHNICIAN TIME: 5.0 hrs. PARKLAND EN~GINEERI~STING, INC. C D V T O TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 1 54196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers, Inc. 1-City of Coppell PROJECT: Overton Bank & Trust Bldg.-102,N.Denton 1-FrankNeal & Tap Road, Coppell,Tx. Associates, Inc. CONTRACTOR: Innovative Developers, Inc., Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER; Redi Mix Concrete (Plant 5) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Slab & Beam: Northeat Bldg. Corner JOB NO; 95-173-1 (Set 2/ Regular concrete) COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 682 11-30-95 12-07-95 7 day 3,431 C 5gallons of water 683 11-30-95 12-28-95 28 day were added after 684 11-30-95 12-28-95 28 day slump test. ADMIXTURES --- MEASURED SLUMP 3.0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- % AIR TEMPERATURE 48 *F TIME-BATCH 7: 15 AM CONCRETE TEMPERATURE 42 oF TIME-TEST 8: 15 AM TRUCK NO. 603 SPECIMEN MADE BY.' Lab. MIX DESIGN NO. 5 Sack (3,000 PSI) TECHNICIAN TIME: 5.0 hrs. PARKLAND E~._.INEERING & TESTING, INC. eter Yu, M. S., P. E. C D V T 0 TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 7501 5 PETER YU. M.S., P,E. TEL: (214) 986-1694 FAX: (214) 790-5378 PRESIDENT CONCRETE TEST-STRENGTH REPORT Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innvoative Coppell, Texas 75019 Developers, Inc. 1-City Of Coppell PROJECT: Overton Bank & Trust Bldg.-102,N.Denton 1-Frank Neal & Tap Road,Coppell, Tx. Associates, Inc. CONTRACTOR: Innovative Developers, Inc., Fort Worth,Tx. P.O.NO: CONCP. ETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 4,000 PSI LOCATION: Slab-Vault Area ( S.E.Bldg. Corner) JOB NO: 95-173-1 (Set 1 / high strength concrete) -First 54 cubic yards only. COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 679 11-30-95 12-04-95 4 day 3,714 C Early break cylinder 680 11-30-95 12-28-95 28 day 681 11-30-95 12-28-95 28 day ADMIXTURES --- MEASURED SLUMP 3% IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 43 oF TIME-BATCH 6: 00 AM CONCRETE TEMPERATURE 40 °F TIME-TEST 6:25 AM TRUCK NO. 191 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 6 Sack (4,000 PSI) TECHNICIAN TIME: 5.0 hrs. PARING & TESTING, INC. C D V T O TESTED IN ACCORDANCE %VITH ASTM STANDARDS