Loading...
Town Center L1B1-LR 951121 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: Coppell, Texas 75019 1-Innovative Developers, Inc. 1-City of Coppel! PROJECT: Overton Bank & Trust Bldg.-102,N.Denton Tap Road,Coppell,Tx. CONTRACTOR: Innovative Developers, Inc. Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Street Approach ( Sandy Lake Road JOB NO: 95-173-1 S.E.entrance/S.W.~ Section) COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 676 11-21-95 11-28-95 7 day 2,405 C 677 11-21-95 12-19-95 28 day 3,360 C 678 11-21-95 12-19-95 28 day 3,325 C I ADMIXTURES --- MEASURED SLUMP 6~ IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 74 °F TIME-BATCH 11: 50AM CONCRETE TEMPERATURE 68 °F TIME-TEST 12: 20 PM TRUCK NO. 172 SPECIMEN MADE BY: Lab. MIX DESIGN NO. Code 906/3,000 PSI TECHNICIAN TIME: 4.0 hrs. PARKLAND ENGINEERING & TESTING, INC. l~er Yu, M. S., P. C D V T 0 TESTED IN ACCORDANCE WITH ASTM STANDAP, DS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 7501 5 PETER YU, M.S., P.E. TEL' (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: Coppell, Texas 75019 1-Innovative Developers, Inc 1-City of Coppell PROJECT: Overton Bank & Trust Bldg.-102,N.Denton Tap Road,Coppell,Tx. CONTRACTOR: Innovative Developers, Inc. Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH'. 3,000 PSI LOCATION: Street Approach ( Sandy Lake Road JOB NO: 95-173-1 S.E.entrance/S.W.~ Section) COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 676 11-21-95 11-28-95 7 day 2,405 C 677 11-21-95 12-19-95 28 day 678 11-21-95 12-19-95 28 day ADMIXTURES --- MEASURED SLUMP 6% IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 74 *F TIME-BATCH 11: 50AM CONCRETE TEMPERATURE 68 °F TIME-TEST 12: 20 PM TRUCK NO. 172 SPECIMEN MADE BY: Lab. MIX DESIGN NO. Code 906/3,000 PSI TECHNICIAN TIME: 4.0 hrs. PAR~F..RING & TESTING, INC. TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEE~NG CONSULTANTS 3601. KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 7501 5 PETER YU, M,S., P.E. TEL: (214)986-1694 PRESIDENT mX: (214) 790-5378 ~OB NO.: 95-~73-~ DATE: November 21, 1995 REPORT OF: Soil Tests Utilizing Nuclear Density Gauge FOR: Overton Bank & Trust, Coppell, Texas. PROJECT: Overton~Ban~ & Trust Duil~ing - 102, N. Denton Tap Road Coppe11, Texas. PROCTOR: 108.6 P.C.F.@ 14.6% ( Brown Sandy Clay w/ clayey sand: On-site soils ) LOCATION DENSITY MOISTURE MAX.DENSITY (P.C.F.) (%) . (%) . 15. 15'E of Water Valve (0') 103.8 14.3 95.6 16. 48'W.,36'S.of N.W.Corner(0') 105.0 15.1 96.7 17. 33'W.,2'N.of N.W.Corner (0') 105.2 15.4 96.9 ( West / Gas & Water Utility Line ) 18. 42'E.,38'S.of S.E.Corner(0') 104.4 14.2 96.1 19. 30'E.,3'N.of S.E.Corner (0') 104.8 15.9 96.5 ( East/ Power Line Twin 4"diameter PVC pipes) 10:15AM. NOTE: 1. Tests were conducted for the utility line crossings. 2. Tests No. 15 thru 17 were for West gas/water line backfills. 3. Tests No. 18 & 19 were for the East Power Line backfills. 4. Test Locations were referenced to the Building corners. PARKLAND ENGINEERING & TEBTING~ INC. Peter Yu, M.S., P.E%~ Geotechnical Engineer C.C.: 1- Client 1- Innovative Developers, Inc./ Mr. Davi4 Dorris, Project Manager 1- City of Coppe11 / Mr. Larry Davis, Construction Inspector