Town Center L3B1-LR 951228ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
?
DAILY FIELD REPORT
TESTED FOR
GASKE CONSTRUCTION
BELLAIRE, TEXAS
DATE 12/28/95
PROJECT
COMERICA BANK
COPPELL, TEXAS
OUR REPORT NO.
95760-12
WEATHER: CLEAR
TEMPERATURE RANGE: 3 5
FI.C;.
ALPHA Repre~ntati~e:
TO:
DATE:
4O
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED TO FIONITOR
PIER EXCAVATIONS. NO PIERS WERE DRILLED OR PLACED WITH CONCRETE.
DRILLING WAS CANCELLED BECAUSE WATER WAS ENCOUNTERED AT 18'
ONE PIER WAS DRILLED AS A SAMPLE, HOWEVER EXCAVATION WAS SUSPENDED DUE TO
WATER, AT WHICH POINT THE PIER HOLE WAS FILLED.
THE TECHNICIAN RETURNED TO THELABORATORY.~