Loading...
Town Center L1B1-LR 951109 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 7501 5 PETER YU. M.S., P.E. TEL: (214)986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214)790-5378 Overton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers, Inc. 1-Frank Neal & PROJECT: Overton Bank & Trust Bldg.-102,N.Denton Associates, Inc. Tap Road, Coppell, Tx. 1-City Of Coppell CONTRACTOR: Innovative Developers, Inc. ,Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Piers (Drive-In Facility) :West Bldg. JOB NO: 95-173-1 Line area COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 672 11-09-95 11-16-95 7 day 2,653 C 673 11-09-95 12-07-95 28 day 674 11-09-95 12-07-95 28 day ADMIXTURES MEASURED SLUMP 4[ IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- % AIR TEMPERATURE 56 ° F T IME-BATCH CONCRETE TEMPERATURE 52 °F TIME-TEST 10: 35 AM TRUCK NO. 129 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5 Sack Mix TECHNICIAN TIME: N/A PARKLAND ENGINEERING & TESTING, INC. C D V T O TESTED lb,' ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 75015 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214)790-5378 0verton Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innovative Coppell, Texas 75019 Developers,Inc. 1-Frank Neal & PROJECT: Overton Bank & Trust Bidg.-102,N.Denton Associates,Inc. Tap Road, Coppell, Tx. 1-City Of Coppell CONTRACTOR: Innovative Developers, Inc. ,Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Piers (Drive-In Facility) :West Bldg. JOB NO: 95-173-1 Line area COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 672 11-09-95 11-16-95 7 day 2,653 C 673 1i-09-95 12-07-95 28 day 3,325 C 674 11-09-95 12-07-95 28 day 3,389 C ADMIXTURES MEASURED SLUMP 4~ IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- AIR TEMPERATURE 56 °F TIME-BATCH CONCRETE TEMPERATURE 52 °F TIME-TEST 10: 35 AM TRUCK NO. 129 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5 Sack Mix TECHNICIAN TIME: N/A ,PAR~O-i~ TESTING, INC. C D V T O TESTED IN ACCORDANCE WITH ASTM STANDARDS