Loading...
Town Center L3B1-LR 951221ALPHA TESTING, I..~ 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPO] T OF FIELD COMPACTION TESTS TESTED FOR: GASKE CONSTRUCTION DATE: BELLAIRE, TEXAS 12/21/95 (REVISED 01/03/96) PROJECT: COMER I CA OUR REPORT NO. 9 5 7 6 0- 9 COPPELL, TEXAS TEST DATA: TEST ~ELEV. SOIL ID O~IMUM M~IMUM ~S IN P~CE IN P~CE PERCENT NO. DATEDE~H~,~~ MOISTURE DRY DENSITY MOISTURE DRY DENS~ COMPAC~N COMMENT NUMBER % PCF % PCF 9 12/21 FG 5L 17.3 106.7 17.5 104 97 Z-A 10 12/21 FG 5L 17.3 106.7 19.4 102 95 1-A 11 12/21 FG 5L 17.3 106.7 18.0 103 97 1-A 12 12/21 FG 4L 17.5 105.0 16.5 104 99 1-G 13 12/21 FG 5L 17.3 106.7 19.3 103 96 1-A 14 12/21 FG 4L 17.5, 105.0 14.9 105 100 1-C TEST LOCATION: 9 DRIVE THRU BANKING APPROX. 20' N. AND 15' E. OF S.E. CORNER OF BLDG PAD 10 EAST PARKING AREA APPROX. 75' N. AND 50' E. OF S.E. CORNER OF BLDG PAD 11 3OUTH FIRELANE APPROX. 30' S. AND 20' W. OF S.E. CORNER OF BLDG PAD 12 ~. DRIVEWAY TO DRIVE THRU BANKING 30' N. & 25' E. OF N,W. CORNER OF BLDG PAI 13 qEST PARKING AREA 40' S. AND 30' W. OF N.W. CORNER OF BLDG PAD 14 {IGHT HAND TURN LANE AT DENTON TAP ROAD 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST FROM RLPHR TESTING 214 620-8911 ALPHA TESTING, ir"'. 2209 Wisconsin St., Suite 100 Dsl~s, Texas 75229 (214) 620-8911 12.28.1995 17:55 NO. 14 REPC, T OF FIELD COMPACTION TESTS P. 2 rESTED FOR: GASKE CONSTRUCTION DATE: 12/21/95 BEL~.AIRE, TEXAS "ROJECT: COMER l CA OUR REPORT NO. 95760-9 COPPEL~., TEXAS rEST DATA: TEST ~EV. SOIL ID OPI:IMUM MAXIMUM LAB IN PI, ACE IN PLACE PERCENT' MOISTURE DRY DENSITY MmaTURE DRY O;,aWY COMPACTION COMMEN~ NO. DATEu=~, ~ NUMBER ~ ~F ~ PCF 9 12/21 FO 5~ 17.3 106.7 17.5 104 97 1-A 10 12/21 FO 5b 17.3 106.7 19.4 102 95 1-A 11 12/21 FG 5~ 17.3 106.7 18.0 103 97 1-A 12 12/21 FO 4~ 12.5 105.0 16.5 104 99 I-A 13 12/21 FG 5h 17.3 106.7 19.3 103 96 1-A 14 12/21 FG 4L 12.5 105.0 14.9 105 100 1-A TEST LOCATION: 9 10 11 12 13 )RIVE THRU BANKING APPROX. 20' N. AND 15' E. OF 8.E. CORNER OF BLDG PAD ~-AST PARKING AREA APPROX. 75' N. AND 50' E. OF S.E. CORNER OF B~.DO PAD 3OUTH FIRELANE APPROX. 30' S. AND 20' W. OF S.E. CORNER OF BLDG PAD . DRIVEWAY TO DRIVE THRU BANKING 30' N. & 25' E. OF N.W. CORNER OF BI, DO P/~. qEST PARKINO AREA 40' S. AND 30' W. OF N.W. CORNER OF BLDG PAD 14 mIGHT HAND TUKN LAHE AT DENTON TAP ROAD 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4, CEMENT TREATED * A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C, MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ×".~,I.,PHA TEST~I~',~~ David P. Stettner