Loading...
Town Center L1B1-LR 951108 PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 154196 IRVING, TEXAS 7501 5 PETER YU, M.S., P.E. TEL: (214) 986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overton Bank & Trust 1-Client CLIENT: p.O. Box 948 COPIES TO: 1-Innvoative Coppell, Texas 75019 Developers, Inc. 1-Frank Neal & PROJECT: Overton Bank & Trust Bldg. -102,N. Denton Associates, Inc. Tap Road, Coppell, Tx. 1-City of Coppell CONTRACTOR: Innovative Developers, inc., Fort Worth,Tx. P.O.NO: CONCRETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Piers (Main Building)-Piers No.26-31) 30B NO: 95-173-1 / Interior COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 669 11-08-95 11-15-95 7 day 2,688 C 670 11-08-95 12-06-95 28 day 671 11-08-95 12-06-95 28 day ADMIXTURES --- MEASURED SLUMP 4.0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- % AIR TEMPERATURE 68 °F TIME-BATCH 11: 01AM CONCRETE TEMPERATURE 60 °F TIME-TEST '12: 05 PM TRUCK NO. 191 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5.0 Sack Mix TECHNICIAN TIME: 'N/A PARKLAND ENGINEERING. & TESTING, INC. C D V T 0 TESTED IN ACCORDANCE WITH ASTM STANDARDS PARKLAND ENGINEERING & TESTING, INC. GEOTECHNICAL ENGINEERING CONSULTANTS 3601 KlM DRIVE, SUITE 102 P.O. BOX 1 54196 IRVING, TEXAS 7501 5 PETER YU, M.S., P.E. TEL: (214)986-1694 PRESIDENT CONCRETE TEST-STRENGTH REPORT FAX: (214) 790-5378 Overtor. Bank & Trust 1-Client CLIENT: P.O. Box 948 COPIES TO: 1-Innvoative Coppell, Texas 75019 Developers, Inc. 1-Frank Neal & PROJECT: Overton Bank & Trust Bldg. - 102, N. Denton Associates, Inc. Tap Road, Coppell, Tx. 1-City of Coppell CONTRACTOR: Innovative Developers, inc., Fort Worth,Tx. P.O.NO: CONCI~ETE SUPPLIER: Redi Mix Concrete ( Plant 1) 28 DAY DESIGN STRENGTH: 3,000 PSI LOCATION: Piers (Main Buildin§)-Piers No.26-31) JOB NO: 95-173-1 / Interior COMPRESSIVE STRENGTH TESTS (6" X 12" CYLINDER) CYLINDER DATE OF DATE AGE COMPRESSIVE TYPE OF REMARKS NUMBER PLACEMENT TESTED DAYS STRENGTH, PSI FAILURE 669 11-08-95 11-15-95 7 day 2,688 C 670 11-08-95 12-06-95 28 day 3,183 C 671 11-08-95 12-06-95 28 day 3,254 C I ADMIXTURES --- MEASURED SLUMP 4.0 IN MAXIMUM AGGREGATE SIZE --- AIR CONTENT --- % AIR TEMPERATURE 68 *F TIME-BATCH 11: 01AM CONCRETE TEMPERATURE 60 °F TIME-TEST 12: 05 PM TRUCK NO. 191 SPECIMEN MADE BY: Lab. MIX DESIGN NO. 5.0 Sack Mix TECHNICIAN TIME: N/A C D V T O TESTED IN ACCORDANCE WITH ASTM STANDARDS