Loading...
Town Center L1B1-CS 950711 P O. Box 478 Coppell. Texas 75019 The City With A Beautiful Future 214-462-0022 July 11, 1995 Bill Anderson Dowdy Anderson & Associates 16250 Dallas Parkway Suite 100 Dallas, Texas 75248 RE: Town Center Blk. I Lot I Overton Bank Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list along with a copy of the Development Fee Calculations for the Town Center BIk. 1 Lot I Overton Bank. Please make payment to the City of Coppell in the amount of $8.669.57 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griff'm, P.E. Asst. City Manager/City Engineer cc: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Park Developmem Coordinator Enclosures KG/ar CITY OF COPPELL DEVELOPMENT FEES Date: July 11, 1995 Project: Town Center Bik. 1 Lot 3 Comerica Bank TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,375.00 $3,375.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $46.10 (100% due at Issuance of Water Meter) Water Meter Deposit $35.00 (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $129.05 (100% due at Issuance of Water Meters) Irrigation Meter Deposit $35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (100% due prior to Council Approval) Street Excrow $4,169.57 $4,169.57 (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2 % of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $9,164.72 $8,669.57 I ' TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL · This fee cannot be assessed until after TIJ Electric subn'dts the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. MEMORANDUM TO: Mike Martin, E.I.T. ...~,,.~.. Howard Pafford, Utilities Superintendent~'..,~ FROM: RE: Development Fees for Town Center Blk. 1LW~r 10verton Bank The following fees should be assessed and collected on the above referenced project. Water Impact Fee: ~ - 1" Domestic Meter/s = 2.5 ESU's 1 - ,1 1/2" Irrigation Meter/s = 5 ESU's Total 7.5 ESU's ~ '$450.00 ea = $ 3,375.00 100% due prior to Council approval of the final plat. Wutewater X~pm~t 1 - 1. Domestic Meter/s - 2.5 ESU's Total 2.5 ESU's ~ $450.00 ea = $ 1,125.00 100% due prior to Council approval of the final plat. Water Tap Inspect/on Fee 2 Connections ~ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots ~ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 1" Domestic Meters ~ $ 46.10ea = S 46.10 100% due prior to issuance of building permit for residential only. All other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 1/2" Irrigation Meter/s @ $ 129.05ea = $ 129.05 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Hon-Residential) 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation HeterDeposit 7 Meters ~ $35.00 ea - $ 35.00 100% due prior to issuance of water meters. Towncen ter ESCAOW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: Lot 1, Block I Town Center Addition (Overton Bank) DATE: 7/10/95 STREET ESCROW: Street Name(s) Sandy Lake Road Street Type P4D/6 Cost per Foot $160.00 Length of Adjacent Frontage (Linear Feet) 252.94 IEscrow due = (Cost per Foot) x (Length of Adjacent Frontage) = $40,470.40 I ROADWAY IMPACT FEE: Service Area * 2 Category ** Commercial Land Use ** Bank Building Size (Sq. Ft.) 6,587 Development Units ** 6.587 Vehicle Miles per Development Unit ** 2.11 Fee per Vehicle Mile $300 Roadway lmp~t Fee due -- (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $4,169.57 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.