Loading...
Town Center L2B3-CS010907 PRELIMINARY F. R REVIEW ONLY T H E C I T Y 0 F' CO??ELL "~ 6 · ~' September 7, ;200] Alen Hinckley Centurion Eagle Inc., Trustee 12201 Merit Drive, Suite 170 Dallas. Tx 75251 RE: Town Center Addition Lot 2 Block 3 Fee Assessment Letter Dear Mr. Hinckley: Enclosed is a copy of the City. of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $6.750.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Setw'ice Center, 732 Deforest. Meters wilt be ordered when these fees are paid. .: Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, [),j~__,iff, '1'~'~ i'~ ~,,~,,12 ov~ '1o Kenneth M. Griffin, P.E. i:, t a ,,,, ,, c~,.~¥.., ~ j Director of Engineering/Public Works c o ,A ,1 t~-~4- ~ ~.~'o. cc: Jennifer Armstrong, Finance Director !/"/' Rhonda Brothers, Engineering Secretary. Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Ga-D.' Sims, Director of Leisure Services PF 'LIMINARY FOR RF_.¥- EW ONLY DEVELOPMENT FEE TABLE Project: Town Center Addition Lot 2 Block 3 Date: 9/7/2001 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $137.81 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $4,377.50 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigatiort/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility. Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available TOTAL $11,690.31 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,750.00 PREL{MiNARY F-"',R REVIEW ONLY DEVELOPMENT FEE WORKSHEET PROJECT: Town Center Addition Lot 2 Block 3 DATE: 9/7/2001 Water Impact Fee: Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 10 ESU's @ $450.00 ea. $4,500.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $137.81 $137.81 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $62.74 $62.74 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $2,157.38 $4,314.76 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 @ $450.00 ea. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utilit3' Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 PRELIMINARY '-')R REVIEW ONLY DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 PRELIMINARy FC- REVIEW ONLY ROADWAY IMPACT FEE CALCULATIONS PROJECT: Town Center Addition Lot 2 Block 3 DATE: 9/7/2001 ROADWAY IMPACT FEE: Service Area * 2 Category. ** Commercial Land Use ** Shopping Center Building Area (sf) 14,080 Development Units ** 14.08 Vehicle Miles per Development Unit ** 4.77 Fee per Vehicle Mile *** $300 Roadxvay Impact Fee due = (Devel,opment Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $20,148.48 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1982 Univest Agreement, this property can not be assessed for Denton Tap & Sandy Lake Rd. Therefore, no Impact Fees will be collected on this project. AMOUNT DUE: $0.00