Town Center L3B3-CS011026 October 26, 2001
Bruce Dunne, P.E.
Welch Engineering, Inc.
4109 Cagle Drive, Suite D
North Richland Hills, Texas 76180
RE: To,an Center, Lot 3 Block 3 (First American Bank) revised
Fee Assessment Letter
Dear Mr. Dunne:
Enclosed is a copy of the CiD' of Coppell Development Fee Assessment Table, along with a copy
of the Development Fee calculations for the referenced development.
There are no fees due on this project at this time. However, please provide a copy of the
Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be
verified.
Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water
and Sewer Impact Fees until the issuance of a Building Permit. Senate Bill 243 also reduced the
impact fee we could assess for water and sewer to no more than 50% of the calculated fee in the
original study.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be
paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be
ordered when those fees are paid.
Appropriate pa,vment of the required fees will help insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please feel free
to contact me at your convenience.
Sincerely, r)
Kenneth M. Griffin, P.E. '
Director of Engineering/Public Works
cc: Jennifer Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
;)55 PARKWAY ~ PO BOX 4'/8 ~' COPP~'LL TX 7501 ~) 1~' TEL 972/462 00;)2 "~ FAX 972i3OA 36'/3
DEVELOPMENT FEE TABLE
Project: Town Center, Lot $ Block 3 (First American Bank) revised
Date: lO/26/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COU'NCIL
APPROVAL
Water Impact Fee $2,800.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $142.10
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationfFireline) $2,154.69
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utilit)' Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) I [I
TOTAL $6,836.79
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Town Center, Lot 3 Block 3 (First American Bank) revised
DATE: 10/26/2001
Water Impact Fee:
Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's
Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's
0 = 0 ESU's
Fireline Meter(s): 1 - 8 inch = 2.5 ESU's
Total #: 10 ESU's @ $280.00 ea. $2,800.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea. $15000
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $142.10 $142.10
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) @ $62.25 $62.25
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: I Fireline Meter(s) @ $2,092.44 $2,092.44
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5 @ $280.00 ea. $1,400.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0 Single-family @ $0.00 per lot $0.00
0 Multi-family @ $0.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Town Center, Lot 3 Block 3 (First American Bank) revised
DATE: 10/26/2001
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Commercial
Land Use ** Bank
Building Area (sO 4,995
Development Units ** 5.00
Vehicle Miles per Development Unit ** 2.1 l
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Developmen~ Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $3,161.84
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1982 Univest Agreement, this property cannot be assessed for Denton Tap Road
& Sandy Lake Road. Therefore, no Roadway Impact Fee will be collected on this project.
Percent of Credit Toward Roadway [mpact Fees 100%
Total Credit $3,161.84
[ AMOUNTDUE: $0.00