Town Center L3B3-CS010917 T H E C I T Y O F COPPELL September 17, 2001 Bruce Dunne Welch Engineering, Inc. FILE 4109 Cagle Dr., Suite D N Richland Hills, TX 76180 RE: Town Center Addition, Lot 3, Block 3 (First American Bank) Construction Plan Review Comments Dear Bruce: The City of Coppell has reviewed the revised plans for the referenced addition. These plans meet our current minimum standards with the exception of comments 1 and 2 below: 1. Your reply to the transition to the relocated low-point inlet was that a 5-foot tangent had been provided. During actual construction, the inspector will require some type of transition along the curb line to the Iow-point inlet. The revised plan did not appear to have been changed in regard to the low-point inlet. 2. On Sheet 6.1, you are showing 6-inch concrete and 5-inch concrete without lime stabilization. Please be advised that a written request must be made to this office prior to the deletion of lime stabilization. The deletion of lime stabilization will require that the paving be increased by 1" or the strength be increased to 4000 psi. 3. All required plans should be submitted to this office for official stamp of City Engineer. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. 4. All fees should be paid prior to the beginning of construction. These fees consist of impact and construction inspection fees to be paid to this office as requested in the Fee Assessment Letter dated September 7, 2001. Once these items have been addressed, you should schedule a conference with the construction inspector. If you have any questions, please contact me at (972) 304-3686. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering & Public Works ............................... 255 PA~K'v~,A¥' 'Jr P O 'aO;< 478 1~' COPPELL TX 7§019 .ir TEL 972z/I62 0022 W FAX 972'304 3673