Loading...
Town Center L3B3-CS010912 W TC-'I-I ] NC;IN RINO, !NC. CONSUL TING ENGINEERS Sept. 12,2001 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Coppell, Texas 75019 RE: Town Center Addition, Lot 3, Block 3 (First American Bank Site) Dear Mr. Griffin: The following revisions have been completed and are offered in response to the corresponding numbered comments in your "Construction Plan Review Comments" letter dated September 7, 2001 for the aforementioned project: 1. A copy of the Final Plat for the project site in included in the construction plans as sheet C8.1. 2. General note comment #4 has been revised to reference City of Coppell Standard Details and Specifications. In addition, general note comment #21 has been revised to remove the City of Coppell from responsibility for inspection service costs. 3. A 5' tangent has been provided at the curb transition to the relocated low point inlet as requested. 4. a. The water line that is shown as "public" has been revised to be an 8" line. b. All public water lines and the proposed fire line vault is contained in a 10' wide easement as indicated on the Final Plat. c. Plans have been revised to provide 1 (one) 3" tap of the City's 8" water line, with a separate tap for the irrigation line off of this 3" line in lieu of the previously shovm two taps of the City's 8" line. d. Ductile iron pipe is not being proposed for use on the water line construction. All water line construction will be PVC piping as requested by the City. Reference to ductile iron pipe has been removed from general utility note # 15. 5. Previous sheet numbers C6.2 & C8.1 have been deleted from the plan set. All construction details will be in accordance with City of Coppell Standard Details and have been noted as such throughout the plans and specifications for this project. 4109 Cagle Drive, Suite D · North Richland Hills, TX 76180 · 817-284-1175 · Fax 817-589-0990 · Metro 817-589-2900 I am re-submitting two revised sets of construction plans reflecting the above corrections, revisions and changes for your review along with the marked-up plans that were previously reviewed by the City. If you have an): questions, please contact me at (817) 284-1175. Sincerely, WELCH ENGINEERING, INC. Brace F. Dunne, P.E. 200144Xrespltr.~l